Laserfiche WebLink
13. <br /> <br />14. <br /> <br />15. <br /> <br />16. <br /> <br />a) Street striping and signing (0 ~ $200) <br />b) Traffic signing (6 @$200) <br />c) Future Through Street Sign (IQ $200) <br />d) Street lights (3 851700) <br />e) Street sweeping <br />f) Sealcoating <br />g) Street light maintenance ( 3~ $270) <br /> TOTAL <br /> <br />$0' <br />$1200.00 <br />$200.00 <br />$5100100 <br />$300.00 <br />$2350.00 <br />$810.00 <br /> <br />$9,960.00 <br /> <br />Hard Surfaced Driveways. Hard surfaced driveways (bituminous or concrete) are a <br />requirement for each lot in the Plat. Said improvement shall be installed by the building permit <br />applicant or the homeowner at the time the Certificate of Occupancy is issued or as soon <br />thereafter as possible, weather permitting. In the event this improvement is not timely <br />installed on a lot, the DEVELOPER and/or the DEVELOPER'S ass!gn(s), agrees that the <br />CITY may install said improvement on the lot and specially assess the cost therefore against <br />the lot. The DEVELOPER hereby waives all right to a public heating and other statutory <br />rights or City Charter rights granted a property owner relating to special assessments, <br />including the right to appeal the special assessment for installation of the hard surfaced <br />driveway. In addition, the DEVELOPER grants the CITY a license to enter on each lot of <br />the Plat in order to install the improvement described in this paragraph if the same has not <br />been previously constructed. <br /> <br />Street CIeaning. After the street surfacing is installed, the DEVELOPER shall clear any soil, <br />earth, or debris from the streets within the Plat resulting from any construction within the Plat <br />by the DEVELOPER or its successors and assigns. From time to time, the CITY'.'may <br />remove accumulations of soil, earth and debris from the streets resulting from the construction <br />of the Plat. It shall be the DEVELOPER'S responsibility to pay the costs associated with <br />this necessary street cleaning. Invoices from the CITY to the DEVELOPER for such costs <br />shall be paid. within fifteen (15) days of the date of invoice. <br /> <br />Private Streets and On-Street Parking. On-street parking shall be prohibited on private <br />stree{s. Further, said on-street parking regulations shall be signed and said signing shall be <br />subject to the approval of the CITY. At no time will the private streets be maintained or <br />accepted for ownership by the CITY. These items shall be clearly stated in the covenants <br />drafted as part of the. homeowners association~ The association documents shall include <br />appropriate enforcement provisions. <br /> <br />Private Street Cleaning. In the event the CITY determines that the private streets and <br />driveway collectors are contributing to the increased sedimentation of the ponds that the <br />CITY is required to maintain, the CITY shall provide the homeowner's association with <br />thirty (30) days written notice to sweep the streets. If the association fails to comply within <br />the thirty (30) day time frame, the CITY or its contractor will sweep the streets and the <br />associated costs shall be the responsibility of the homeowner's association. CITY expenses <br />incurred in sweeping the private streets and/or driveway collectors shall be paid within thirty <br /> Villas of Meadow Pointe Townhomes Subdivision <br /> Development Agreement . <br /> Page 6 of 12 <br /> <br />-241- <br /> <br /> <br />