Laserfiche WebLink
-80- <br /> <br />c) <br /> <br />d) <br /> <br />footing inspections and the requirement for a certificate of grading on lots with less than <br />a 2% Hade shall be stated on the final ~ading plan. Certificates of grading will be <br />required for Lots 19-26, Block 2. <br />Table indicating house style, front/rear Hade slopes, street elevations, Iow floor <br />elevations, garage floor elevation, lowest opening elevation, and 100 year flood elevation <br />must be provided. <br />Provisions shall be made to preserve and protect existing drainage patterns near Hwy. 47. <br />The installation of the sound wall could hamper those drainage patterns. <br /> <br />Utility Plan: Staff has received plans and specifications for utility construction prepared by <br />John Oliver and Associates dated July 19, 2002 and last modified on August 15, 2002 and <br />have the following comments: <br /> <br />· Sheet 2 of/2 - Fluorine Drive shall be labeled "Fluorine Street NW" <br />· Sheet 3 of 12- Note 4 needs to be changed to 9 feet instead of I0 feet t0 ensure that the <br /> curb box is within drainage and utility easement. Incorrect labels for manhole, on profile <br /> view should be corrected. Fluorine Drive shall be labeled "Fluorine Street NW" <br />[] Sheet 4 of 12 -Fluodne Drive shall be labeled "Fluorine Street NW". Note 4 needs to be <br /> changed to 9 feet instead of 10 feet to ensure that the curb box is within drainage and <br /> utility easement.. Lacorrect labels for manhole on profile view should be corrected. <br />· Sheet 5 of 12 - Fluorine Drive shall be labeled "Fluorine Street NW". The uncurbed <br /> parking drives at the end of the private streets shall be removed. <br />· Sheet 6 of 12- The uncurbed parking drives at the end of the private streets shall be <br /> removed. <br />· Sheet 7 of/2 - The uncurbed parking drives at the end of the private streets shall be <br /> - removed. <br />· Sheet 12 of 12 - Add note: All valves not located in paved area must be marked with a <br /> blue carconite stake. <br /> <br />Staff also has the following general comments regarding specifications that were submitted <br />as part of EverHeen Point 1st Addition: <br /> <br />b) <br /> <br />c) <br /> <br />d) <br /> <br />All manhole and catchbasins shall use an infishield with a minimum thickness of <br />60 mi to seal the outside of the casting and rings to control infiltration and inflow. <br />See manufacturer's recommendations for installation instructions. <br />On SP 10 of 21, valve extensions shall conform to Detail Sheet 15 of 16 and be <br />installed to a point no less than 1 foot below the proposed grade. <br />On SP 17 of 21, remove the sentence: Pavement smoothness shall be waived for <br />this project. <br />The off-site stormwater improvement plan will be reviewed by Hakanson <br />Anderson Associates, Lac. and the plan shall be modified as required by review <br />letter prepared by Hakanson Anderson and Associates, Inc. <br /> <br />Sound Mitigation: It is the City's responsibility to take reasonable measures to ensure <br />compatibility between land use and traffic noise generated fi.om an adjacent highway. After <br />a traffic noise level study conducted by SKF, Inc. it has been determined that a 10-foot sound <br />wall or a combination of berming and sound wall must be completed as part of this <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />