|
S TAT E ME N T O F WORK C E RTI F I E
<br />
<br /> STATE OF MINNESOTA - DEP.~TMENT OF TRANSPORTATION
<br />
<br />D
<br />
<br />MAiN BODY ITEMS (Group Level Detail)
<br />
<br />Voucher No. 11 Shee~ No~ 12
<br />
<br />Item Contract Uni~ Contrac~ Con~rac~ To Date To Date Grp Line
<br />Nu~er Item Unit Price Quantity ~unou_nt Quan~i~y Amount No. No.
<br />
<br />2506.502 CONST DRAINAGE STRUCTURE DESIGN EACH 3,750.00 1~00 3,750.00 1.00 3,750.00 002 1060
<br /> Totals ~or Proposal Line Number 1060 1.00 $3,750.00 1.00 $3,750.00
<br />
<br />2506.516 C31STING ASSEMBLY EACH 470.00 104.00 48,880.00 115.00 54,050.00 002 1070
<br />2506.516 CASTING ASSEMBLY EACH 470.00 4.00 1,880.00 .4.00 1,880.00 004 1070
<br />2506.516 CASTING ASSEMBLY EACH 470.00 10.00 4,700.00 12.00 5,640.00 006 1070
<br />2506.516 CASTING ASSEMBLY EACH 470.00. 13.00 6,110.00 0.00 0.00 007 1070
<br />
<br /> Totals for Proposal Line Number 1070 131.00 $61,570.00 131.00 $61,570.00
<br />
<br />2506.522 ADJUST FRAME & RING CASTING EACH 300.00 11.00 3,300.00 11.00 3,300~00 001 1080
<br />
<br /> Totals for Proposal Line Number 1080 11.00 $3,300.00 11.00 $3,300.00
<br />
<br />2506.602 CONq~ECT INTO EXISTING ~%ANBOLE EACH 720.00 2.00 1,440.00 2.00 1,440.00 007 1090
<br />
<br /> Totals for Proposal Line Number 1090 2.00 $1,440.00 2.00 $1,440.00
<br />
<br />2506.602 CONSTRUCT SANIT~Y M~%NHOLE EACH 1,645.73 11.00 18,103.03 10.00 16,457.30 007' 1100
<br />
<br /> Totals for Proposal Line Number 1100 11.00 $18,103.03 10.00 $16,457.30
<br />
<br />2506.603 CONSTRUCT SANITARY ~L~NHOLES M 268.87 14.00 3,764.18 10.94 2,941.43 007 1!10
<br />
<br /> Totals for Proposal Line Number 1110 14.00 $3,764.18 10.94 $2,941.43
<br />
<br />2506.602 RECONSTRUCT SA/~IT~Y MANHOLES M 500.00 4.90 2,450.00 8.24 4,120.00 001 1120
<br />
<br /> Totals for Proposal Line Number 1120 4.90 $2,450.00 8.24 $4,120.00
<br />
<br />2511.501 RANDOM RIPRAP CLASS III M3 73.08 62.10 4,538.26 74.20 5,422.53 002 1130
<br />
<br /> Totals for PrOposal bine Number 1130 62.10 $4,538.26 74.20 -'$5,422.53
<br />
<br />2521.501 75 MM CONCRETE WALK M2 21.26 4,085.00 86,847.10 2,874.00 61,101.24 001 1140
<br />
<br />2521.501 75 MM CONCRETE WALK M2 21.26 398.00 8,461.48 269.00 5,718.94 003 1140
<br />
<br /> Totals for Proposal Line Number 1140 4,483.00 $95,308.58 3,143.00 $66,820.18
<br />
<br />2521,501 100 MM CONCRETE WALK M2 22.38 139.00 3,110.82 217.00 4,856.46 001 1150
<br />
<br />2521.501 100 MM CONCRETE WALK M2 22.38 709.00 15,867.42 2,011.00 45,006.18 005 1150
<br />
<br /> Totals for Proposal Line Number 1150 848.00 $18,978'.24 2,228.00 $49,862.64
<br />
<br />2521.501 150 MM CONCRETE WALK M2 29.66 43.00 1,275.38 49.30 1,462.23 001 1160
<br />
<br />2521.501 150 M~ CONCRETE WALK M2 29.66 12.00 355.92 13.70 406.34 005 1160
<br />
<br /> Totals for Proposal Line Number 1160 55.00 $1,631.30 63.00 $1,868.58
<br />
<br />LOW S.P. NL~4BER 199-010-03
<br />
<br />FOR WORK COMPLETED AS OF 08/12/2002
<br />
<br />Contract Number: Z00516
<br />
<br />-177-
<br />
<br />
<br />
|