|
S TATE-MENT OF WORK CERT ! F I ED
<br />
<br /> STATE OF MINNESOTA - DEP.~TMENT OF TFtA~SPO~TATION
<br />
<br />MAIN BODY ITEMS (Group Love,! De,ali)
<br />
<br /> Voucher No. 11 ' Sheet No: 13
<br />
<br /> Item Contract Unit Contract Contract To Date To Date Grp LAne
<br /> Number Item Unit PriDe Quantity ~ount Quantity ;unount No. No.
<br />
<br />2521.5Z! 50 ~v~4 BITtk4INOUS WALK ~2 6.30 2,965.00 18,679.50 4~790.00 30,177.00 001 1170
<br />
<br /> Totals for Proposal Line Number 1170 2,965.00 $18,679.50 4,790.00 $30,177.00
<br />
<br />2531.501 CONCRETE C~B & GUT~R DESIGN M 21.28 428.00 9,107.84 355.00 7,554.40 003 1180
<br />
<br /> Totals for Proposal Line Number 1180 428.00 $9,107.84 355.00 $7,554.40
<br />
<br />2531.501 CONCRETE C~JRB & GtT!~TER DESIGN M 24.79 168.00 4,164.72 168.00 4,164.72 003 1190
<br /> Totals for Proposal Line Nun%bet 1190 168.00 $4,164.72 168.00 $4,!64.72
<br />
<br />2531.501 CONCRETE Ct/R~ & GUTTER DESIGN M 26.10 8,515.00 222,241.50 8,536.00 222,789.60 001 1200
<br />
<br /> Totals for Proposal Line Number 1200 8,5!5.00 $222,241.50 8,536.00 $222,789.60
<br />
<br />2531.501 CONCRETE C~3RB & GU/~ER DESIGN M 22.85 1,096.00 25,043.60 1,059.00 24,198.15 001 1210 []
<br /> 22.85 886.00 20,245.10 1,264.00 28,882.40 005 1210
<br />
<br />2531.501 CONCRETE C~B & GtTFTER DESIGN M
<br />
<br /> Totals for Proposal Line Number 1210 1,98~.00 $45,288.70 2,323.00 $53,080.55
<br />
<br />2531.502 CONCRETE ~ DESIGN S5 M 35.70 84.00 2,998_80 83.00 2,963.10 001 1220
<br />
<br /> Totals for ~roposal Line Number 1220 84.00 $2,998.80 83.00 $2,963.10
<br />
<br />2531.507 200 MM CONCRETE DRIVEWAY PAVEMENT M2 42.84 228.30 9,780.37 63.00 2,698.92 001 1230
<br /> To~a!s for Proposal Line Number !230 22~.30 $9,780.37 63.00 $2,698.92
<br />
<br />2S40.602 MJkIL BOX SUPPORT EAC~ 125.00 4.00 500.00 4.00 500.00 001 1240
<br />
<br /> Totals for Proposal Line Number 1240 4.00 $500.00 4.00 $500.00
<br />
<br />2545.509 CO~UIT SYSTEM (SIGN, S) LS 14,362.00 0.80 11,489.60 0.80 11,489.60 001 1250
<br />!545.509 CO~UIT SYSTEM (SIGNALS) LS 14,362.00 0.10 1,436.20 0.10 1,436.20 00~ 12S~
<br />2545.509 CONDUIT SYSTEM (SIGN,S) LS 14,362.00 0.10 1,436.20 0.10 1,436.20 005 1250
<br /> To,als for Proposal Line Nu~er 1250 1.00 $I4,~62.00 1.00 $14,362.00
<br />
<br />~554.509 GUIDE POST ~PE S EACH 27.00 38.00 1,406.0D 24.00 888.00 002 1260
<br />2554.509 GUIDE POST TYPE B EACH 37.00 5.00 L85.00 5.00 185.00 004 1260
<br />2554.509 GUIDE POST TYPE B EACH 37.00 4.00 148.00 0.00 0.00 006 1260
<br />
<br /> To,als ~or Proposal Line Number 1260 47.00 $1,739.00 29.00 $1,073.00
<br />
<br />2557. 603 WOODEN FENC~ M 36.50 278.00 10, 1~7.00 184.00 6,716.0O 00l 12~0
<br />
<br /> To~ais for Proposal Line Number 1270 278.00 $10,147.00 184.00 $6,716.00
<br />
<br />2557 . 603 B~ED WIRE FENCE M 16 . 50 220 . 00 3 , 630 . 00 545 . 00 8 , 992 . 50 001 1280
<br />
<br />LOW S.P. ~ER 199-010-03 FOR WORK COMPLETED ~ OF 08/12/2002 Con~rac~ Number: Z00516
<br />
<br />-178-
<br />
<br />
<br />
|