My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/19/2002
Ramsey
>
Public
>
Agendas
>
Council
>
2002
>
Agenda - Council - 08/19/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:10:30 AM
Creation date
9/3/2003 12:30:41 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/19/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br />OPINION OF COSTS <br />RAMSEY MULTIMODAL <br />FACILITY <br /> CITY OF RAMSEY <br /> FILE # RA3169 <br /> JULY 30,2002 <br /> <br />BID SCHEDULE "C" - TRAIL CONSTRUCTION Estimated ~ <br />Item Description Quantity Unit Price Extension <br /> <br />31 Mobilization 1LS $1,500.00 /LS $ 1,500.00 <br /> 32 '!Traffic Control 1.00 LS $ 200.00 ILS $ 200.00 <br /> <br />33 Clearing & Grubbing 0.6 AC $4,000.00 /AC $ 2,400.00 <br />34 Common Excavation (P) 4,400 CY $ 2.50 /CY $ 11,000.00 <br />35 Aggreg.ate Base, Class 5 1,450 TON $ 10.00 /TON $ 14,500.00 <br />36 2.0" Type 41 Bituminous Wear Course - Std. 550 TON $ 40.00 /TON $ 22,000.00 <br />37 F & I Sign Panel (Type C) 4 EA $ 160.00 lEA $ 640.00 <br />38 Seeding, incl. Seed, Fertilizer & Mulch 2.2 AC $1,000.00 /AC $ 2,200.00 <br /> <br />39 Sodding, Lawn & Boulevard Type .. 3250 SY $ 2.00 ISY $ 6,500.00 <br />40 Silt Fence, Pre-Assembled 4,800 LF $ 1.80 /LF $ 8,640.00 <br />41 ISalvage & Reinstall Topsoil (LV) 1800 CY $ 1.80 /CY $ 3,240.00 <br /> <br />Bid Schedule "C" - Trail Construction <br /> <br />BID SCHEDULE "D" - RIGHT TURN LANE CONSTRUCTION <br /> <br /> Item Description <br /> <br /> $ 72,820~00 <br /> <br />Estimated <br />Quantity Unit Price Extension <br /> <br />31 IMobilization 1 LS $1,500.00 /LS $ 1,500.00 <br />32 ITraffic Control 1 'LS $2,000.00 ILS $ 2,000.00 <br />33 Remove Bituminous 650 SY $ 2.00 /AC $ 1,300.00 <br /> <br />34 ICommon Excavation (P) 250'CY $ 4.00 ICY $ 1,000.00 <br /> <br />35 6" Aggregate Base, Class 5 320 TON $ 10.00 /TON $ 3,200.00 <br />..36 1.5" Type 4'~ Bituminous Wear Course 70 TON $ 45.00 /TONI $.. 3,150.00 <br />37 2.5" Type 31 Bituminous Base Course 120 TON $ 43.00 /TON~ $ 5,160.00 <br /> <br />38 IF & I Sign Panel (Type C) 2EA $ 160.00 /FA $ 320.00 <br /> <br />39 I Seeding, incl. Seed, Fertilizer & Mulch 0.3 !AC $1,000.00 /AC $ 300.00 <br /> <br />40 Sawcut 500SY $ 1.50 /SY $ 750.00 <br />41 ~Silt Fence, Pre-Assembled 5001LF $ 1.80 /LF $ 900.00 · <br /> <br />Bid Schedule "D" - Right Turn Lane Construction $ 19,580.00 <br /> <br /> OPINION OF COSTS <br />Summary <br /> <br />Bid Schedule "A" - STORM SEWER <br /> <br />Bid Schedule "B" - PARKING LOT CONSTRUCTION <br /> <br />Bid Schedule "C" - TRAIL CONSTRUCTION <br /> <br />Bid Schedule "D" - RIGHT'TURN LANE CONSTRUCTION <br /> <br />Total Bid: <br /> <br />$ 34,060.00 <br />$ 245,370.00 <br />$ 72,820.00 <br />$ 19,580.00 <br />- $ 37'1,830.00 <br /> <br />shared clocs/rnunlc~patlaram seyl3169/RA3169Es.xls <br />Sheet: Opinlion Of COSTS <br /> <br />BT-2 <br /> <br />-21- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.