Laserfiche WebLink
OPINION OF COSTS <br />RAMSEY MULTIMODAL <br />FACILITY <br /> CITY OF RAMSEY <br /> FILE # RA3169 <br /> JULY 30,2002 <br /> <br />PROPOSED RAMSEY MULTIMODAL FACILITY <br /> <br />BID SCHEDULE "A" - STORM SEWER OPINION OF COSTS <br /> Estimated <br /> Item Description Quantity Unit Price Extension <br /> <br />1 12" RCP (CL5) (0'-8' Depth) 370 LF $ 21.00 /LF $ 7,770.00 <br />2 t8" RCP (CLB) (0'-8' Depth) 290 LF $ 23.00 /LF $ 6,670.00 <br />3 24" RCP (CL3).!.0'-8' Depth,) .... 145 LF $ 36.00 I/LF .$... 5,220.00 <br />4 18"RCPFES 2 EA $ 800.00 /FA $ 1,600.00 <br />5 24" RCP rES 4 EA $1,000.00 /FA $ 4,000.00 <br />6 Construct Manhole 4' dia. (0'-8') 4 FA $1,600.00 /EA $ 6,400.00 <br /> <br />..7 Class tll Random Rip-Rap 48.0 CY $ 50.00 /CY $ 2,400.00 <br /> <br />Bid Schedule "A" - Storm Sewer $ 34,060.00 <br /> <br />BID SCHEDULE "1~". PARKING LOT CONSTRUCTION <br /> Estimated <br />Item Description Quantity Unit Price Extension <br /> <br /> 8 Mobilization 1 LS $1,500.00 /LS $ 1,500.00 <br /> 9 Subgrade Preparation 10,700 SY $ 0.70 /SY $ 7,490.00 <br /> 10 Saw Bituminous Pavement 140 LF $ 1.00 /LF $ 140.00 <br /> 11 Common Excavation (P) 14,520 CY $ 2.00 ICY $ 29,040.00 <br /> 12 Concrete Curb & Gutter, Design 8-618 2,420 LF $ 8.50 /LF $ 20,570.00 <br /> 13 Concrete Sidewalk 10,100 SF $ 2.20 /SF $ 22,220.00 <br /> 14 6" Aggregate Base, Class 5 3,860 TON -$ 8.00 /TON $ 30,880.00 <br /> 15 2.5" Type 41 Bituminous Wear Course- Std. 1350 TON $ 35.00 /TON $ 47,250.00 <br /> 16 1.5" Type 41 Bituminous Wear Course - HD 170 TON $ 35.00 !/TON $ 5,950.00 <br /> 17 2.0" Type 31 Bituminous Base Course - HD 220 TON $ 33.00 i/TON $ 7,260.00 <br /> 18 Bit. Material for Tack Coat 100 GAL $ 1.50 /GAL $ 150.00 <br /> 19 Striping 4,500 LF. $ 1.80 /LF $ 8,100.00 <br /> 20 F & I Sign Panel (Type C) 20 EA $ 160.00 '/FA $ 3,200.00 <br /> 21 Seeding, incl. Seed, Fertilizer & Mulch 1.5 AC $ 800.00 /AC $ 1,200.00 <br /> 22 Sodding, Lawn & Boulevard Type 4000 SY $ 2.00 /SY $ 8,000.00 <br /> 23 Silt Fence, Pre-Assembled 1,600 LF $ 1.80 /LF $ 2,880.00 <br /> 24 ,.salvage & Reinstall Topsoil (LV) 1200 CY $ 1.70 /CY $ 2,040.00 <br /> 25 Light Pole - 30' 12 EA $1,600.00 lEA $ 19,200.00 <br /> <br /> 26 Transformer 1 EA $1,400.00 lEA $ 1,400.00 <br /> <br /> 27 Wiring 1200 LF $ 4.50 /LF $ 5,400.00 <br /> <br /> 28 Bike Rack 101FA $ 200.00 /EA I $ 2,000.00 <br /> 29 Shelter 1 FA $ 7,000.00 /FA ! $ 7,000.00 <br />.__30 .tLandscape' Trees " ... 50!EA $ 250.00 lEA I$ 12,500.00 <br /> <br />Bid Schedule "B"- Parking Lot Construction <br /> <br />$ 245,370.00 <br /> <br />--20.--shared docslmuniclpatlararnsey131691RA3169E$.xls <br /> Shoe[: Opintion of Costs <br /> <br />BT-1 <br /> <br />I <br />I <br />I <br />I, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />! <br />I <br />I <br />I <br />I <br /> <br /> <br />