|
City of Ramsey, Minnesota
<br />Capital Improvement Program
<br />2011 thm 2015
<br />PROJECTS BY CATEGORY
<br />Category Project# Priority 2011 2012 2013
<br />Includes Future Projects
<br />2014 2015 Total
<br />Water Utility Improvement
<br />WM Looping: Alpine Dr. (CSAH 5 to Germanium St.)
<br />04 -WTR -001
<br />Renovate Pump House 2
<br />04 -WTR -004
<br />Complete Pump House 3
<br />04 -WTR -005
<br />RTC Bunker Lake Blvd (Armstrong to Ramsey Blvd)
<br />04 -WTR -009
<br />Water Treatment Plant Construction
<br />04 -WTR -017
<br />Watermain Looping: (Ramsey Blvd to Armstrong Blvd)
<br />04 -WTR -018
<br />1.5 MG Ground Storage Reservoir
<br />05 -WTR -004
<br />Well Rehabilitation
<br />07 -WTR -001
<br />River Pines Lift Station Water Connection
<br />08 -WTR -003
<br />Water Meter Replacement
<br />08 -WTR -004
<br />Well House I Improvements
<br />09 -WTR -001
<br />C.R. 57 /Alpine Drive Watermain Looping
<br />11 -WTR -001
<br />Magnesium Street Watermain Looping
<br />11 -WTR -002
<br />Fire Station #1 Extension of Water
<br />11 -WTR -003
<br />Water Utility Improvement Total
<br />32,000 140,000
<br />GRAND TOTAL
<br />6
<br />100,000
<br />100,000
<br />5
<br />49,000 49,000
<br />6 60,000
<br />60,000
<br />6
<br />225,000
<br />225,000
<br />6
<br />9,700,000 8,700,000
<br />18,400,000
<br />6
<br />226,100
<br />226,100
<br />6
<br />2,000,000
<br />2,000,000
<br />6 24,000
<br />26,000
<br />28,000 30,000
<br />32,000 140,000
<br />6
<br />20,000
<br />20,000
<br />6 237,300
<br />249,200
<br />486,500
<br />6 8,000
<br />8,000
<br />6 35,000
<br />35,000
<br />6 35,000
<br />35,000
<br />6 15,000
<br />15,000
<br />414,300 2,500,200 9,954,100 8,850,000 81,000 21,799,600
<br />414,300 2,500,200 9,954,100 8,850,000 81,000 21,799,600
<br />Revised 1212010
<br />Page 267
<br />
|