Laserfiche WebLink
Capital Improvement Program 2011 tliril 2015 <br />City Of Ramsey, N inneSOta Department Water Utility <br />Contact Unassigned <br />Project 04 -WTR -001 Type Improvement <br />Useful Life 50 Years <br />Project Name WM Looping: Alpine Dr. CSAH 5 to Germanium St. <br />p b' p � ) Category Water Utility Improvement <br />Priority 6- Planned <br />Status Active <br />Desciiption Total Project Cost: $100,000 <br />This project includes the installation of 2400 if of 12" watermain along the north side of Alpine Dr. from CSAH 5 to Germanium Street. <br />Justification <br />This project would complete a 12" loop along Alpine Drive which will have the benefit of bolstering fire flows along the northern edge of the water <br />utility service area. <br />Expenditures 2011 2012 2013 2014 2015 Total <br />Improvements Other than Build 100,000 100,000 <br />Total 100,000 100,000 <br />Funding Sources <br />Water Utility Fund <br />2011 2012 2013 2014 2015 Total <br />100,000 100,000 <br />Total 100,000 100,000 <br />Revised 12 2010 <br />Page 268 <br />