My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/23/2002
Ramsey
>
Public
>
Agendas
>
Council
>
2002
>
Agenda - Council - 07/23/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:09:35 AM
Creation date
9/3/2003 1:48:37 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/23/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-172- <br /> <br />13. <br /> <br />14. <br /> <br />f) Street sweeping <br />g) Seal coating <br />h) Adjusting water shut-off boxes <br />i) Maintenance of storm water and facilities <br />j) Boulevard seeding <br /> <br />(" Stage II Improvements") <br /> <br />Payment for Stage II Improvements. The CITY will install in the Plat the Stage II <br />Improvements. The DEVELOPER shall also deposit an amount that is determined by <br />the CITY to be adequate to aid in the operation and maintenance of street lights in <br />locations within the Plat determined by the City Engineer and installed by Con.nexus for <br />the first three (3) years after final plat approval. The CITY will bill residents in the Plat <br />at least quarterly for street light maintenance and operation costs; billing will be initiated <br />at the time a residence connects to municipal water and sanitary sewer. The <br />DEVELOPER will pay to the CITY an amount equal to 100% of the Ci.ty Engineer's <br />estimated construction cost of the items prior to recording of the final Plat. The City <br />Engineer's estimated cost of construction is: <br /> <br />a) Street striping and signing (3 ~ $200) <br />b) Traffic signing (1 ~ $200) <br />c) Future through street sign (2 ~ $200) <br />d) Street lights (7 ~ $1700) <br />e) Street light maintenance (7 @ $270) <br />f) Street sweeping <br />g) Sealcoating (4,800 sq. yds. ~ $.90/sq. yd. <br />h) Adjusting water shut-offboxes <br />i) Maintenance of storm water and facilities <br />j) Boulevard seeding <br /> TOTAL <br /> <br />$60O.00 <br />$200.00 <br />$400.00 <br />$11,900.00 <br />$1,890.00 <br />$3O0.00 <br />$4,320.00 <br />No charge <br />No charge <br />No charge <br />$19,610.00 <br /> <br />Hard Surfaced Driveways. Hard Surfaced driveways (bituminous or concrete) are a <br />requirement for each lot in the Plat. Said improvement shall be installed by the building <br />permit applicant or the homeowner at the time the Certificate of Occupancy is issued or <br />as soon thereafter as possible, weather permitting. In the event this improvement is not <br />timely installed on a lot, the DEVELOPER and/or the DEVELOPER'S assign(s), <br />agrees that the CITY may install said improvement on the lot and specially assess the <br />cost therefore against the lot. The DEVELOPER hereby waives all fight to a public <br />hearing and other statutory fights or City Charter fights granted a property owner relating <br />to special assessments, including the fight to appeal the special assessment for installation <br />of the hard surfaced driveway. In addition, the DEVELOPER grants the CITY a license <br />to enter on each lot of the Plat in order to install the improvement described in this <br />paragraph if the same has not been previously constructed. <br /> <br />Sunflower Ridge Subdivision <br />Development Agreement <br />Page 5 of 12 <br /> <br />I <br />I <br /> <br />I <br />I <br />I' <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> I <br />i <br />I <br /> I <br /> I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.