Laserfiche WebLink
15. <br /> <br />16. <br /> <br />17. <br /> <br />18. <br /> <br />Street Cleaning. After the street surfacing is installed, the DEVELOPER shall C~ear any <br />soil, earth, or debris from the streets within the Plat resulting from any construction <br />within the Plat by the DEVELOPER or its successors and assigns. From time to time, <br />the CITY may remove accumulations of soil, earth and debris from the streets resulting <br />from the construction of the Plat. It shall be the DEVELOPER'S responsibility to pay <br />the costs associated with this necessary street cleaning. Invoices from the CITY to the <br />DEVELOPER for such costs shall be paid within fifteen (I5) days of the date of invoice. <br /> <br />Private Streets and On-Street Parking. On-street parking shall be prohibited on <br />private streets. Further, said on-street parking regulations shall be signed and said <br />signing shall be subject to the approval of the CITY. At no time will the private streets be <br />maintained or accepted for ownership by the CITY. These items shall be clearly stated in <br />the covenants drafted as part of the homeowners association. The association documents <br />shall include appropriate enforcement provisions. <br /> <br />Private Street Cleaning. In the event the CITY determines that the private streets and <br />driweway collectors are contributing to the increased sedimentation of the ponds that the <br />CITY is required to maintain, the CITY shall provide the homeowner's association with <br />thirty (30) days written notice to sweep the streets. If the association fails to comply <br />within the thirty (30) day time frame, the CITY or its contractor will sweep the streets <br />and the associated costs shall be the responsibility of the homeowner's association. <br />CITY expenses incurred in sweeping the private streets and/or driveway collectors shall <br />be paid within thirty (30) days of billing. Failure to compensate the CITY for the <br />services shall be cause for a special assessment to be levied against the Plat and certified <br />to the County Auditor for collection in the manner as taxes and special assessments are <br />certified and collected. The DEVELOPER herein grants permission and a license to the <br />CITY or its contractors and assig-ns to enter upon the Plat for the purpose of cleaning the <br />private streets and/or driveway collectors. The DEVELOPER shall also be responsible <br />for including these provisions in the covenants drafted as a part of the homeowner's <br />association. <br /> <br /> SECTION III <br />PERMITS AND OCCUPANCY <br /> <br />Requirements for Building and Occupancy Permits. No building permit for any lot in <br />the Plat shall be issued until: (a) a Class 5 driving surface is installed to within 300 feet <br />of the structure; (b) a Certificate of Survey, including that survey information required <br />by the CITY has been supplied to the City Building Official; and (c) all the financial <br />guarantees required by the CITY have been satisfied. All foundation approvals will <br />require a certificate of elevation verifying that the actual elevation is in compliance with <br />the approved grading and drainage plan. No occupancy permit for any lot in the Plat <br />shall be issued until: (a) vehicular access to the lot is provided including the installation <br />of at least one layer of bituminous surfacing; (b) all utilities are in place, operational and <br />accepted by the CITY; (c) for lots that have a slope of less than 2%, a certificate of <br /> <br /> Sunflower Ridge Subdivision <br /> Development Agreement <br /> Page 6 of 12 <br /> <br />-173- <br /> <br /> <br />