My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/25/2002
Ramsey
>
Public
>
Agendas
>
Council
>
2002
>
Agenda - Council - 06/25/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:09:16 AM
Creation date
9/3/2003 2:13:42 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/25/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-342- <br /> <br /> Elmcrest Park~ City of Ramse¥ <br />Minnesota Children, Families and Learning - <br />Minnesota Amateur Sports Commission Grant <br /> <br />Ledger of Expenditures (as of 6-20-02) <br /> <br />Item description <br /> <br />Legal Description and Survey of Project Site [Hakanson Anderson] <br /> <br />Park Survey [Storm Water related] <br /> <br />Well Drilling of 8" Well for Water Source to provide Irrigation for Soccer Fields. <br />Rock Flume from well discharge to wetland edge <br /> <br />Electrical Feed Point to Provide Electric Service to Site [Connexus Energy] <br />(Includes Transformer and Transformer Capacity fee) <br /> <br />Misc. Electrical Connections on-site including Electrician, Welt, Concrete <br />Pads/Bollards for all electrical enclosures. <br /> <br />Booster Pump [Pumps water under high pressure from pond to Soccer Fields] <br />Intake FIoat for Booster Pump and labor and materials for intake assembly <br /> <br />Site Grading and Erosion Control- Includes Silt Fence, Mobilization, Clear and Grub <br />Trees, Rough and Fine Grading & Gravel Access Road and Parking. <br /> <br />Irrigation Installation - Includes ail materials and labor for installation. <br /> <br />Athletic Turf Installation for Soccer Fields - Includes all materials and labor for <br />16 plus acres of installation and maintenance period on turf grasses. <br /> <br />Seeding / Installation to stabilize disturbed areas due to gading operations <br />For access road, water holding pond for irrigation - Includes all materials and labor <br />For installation and a maintenance period on 44 acres of cover crop. <br /> <br />Fencing to protect seeding <br /> <br />Disease Resistant Elm Trees <br /> <br />Base Cad Information / Prelim/nary Layout - [Tom Borchard] Consulting <br /> <br />Investment <br /> <br />$1,600.00 <br />$1,350.00 <br />$38,043.10 <br /> <br /> $9,790.00 <br /> <br />$4,880.00 <br /> <br />$10,500.00 <br />$16,294.50 <br /> <br /> $775.00 <br /> <br />$84,640.70 <br />$49,970.00 <br /> <br />$32,800.00 <br /> <br />$15,000.00 <br /> <br /> $3,000 <br /> <br /> $490.OO <br />$1,500.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.