Laserfiche WebLink
Staging of Development - -MUSA Expansion <br />Future expansion of Urban Services must be done in a manner consistent with the provisions <br />and process outlined in the City Charter. <br />Between 2008 and 2030, sewered development will continue in a contiguous fashion from the <br />existing sewered areas. However, since large portions of the city have already been developed <br />at in a very low density pattern, it is unlikely that many of these areas will be served by <br />municipal services before 2030. <br />Based on extensive public input, it was determined that it was logical to extend services north of <br />Trott Brook with the understanding that private development would likely bear the cost of any <br />future extension. This area is the last area of the city that has significant undeveloped larger <br />lots, which provide the opportunity for development concepts which incorporate key elements <br />such as density transition and natural resources protection and still allow for economic <br />feasibility. <br />Table 5 -4 demonstrates the staging of sewered development in 5 -year increments to 2030 <br />consistent with the 2030 Land Use Plan map. <br />