My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/14/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 12/14/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:50:29 PM
Creation date
12/9/2010 9:17:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/14/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
794
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part 2.00 — Products <br />2.01 Materials and Design <br />protect <br />The structural stormwater treatment system shall be made of pre -cast concrete. The manufacturer shall <br />be a member of the American Concrete Pipe Association or the National Pre -cast Concrete Association <br />and meet the following manufacturing requirements: <br />A. Structures shall be designed to comply with ASTM Designation C -478. <br />eco9torm <br />Page 2 of 4 <br />B. Sections shall have watertight joints consisting of either gasketed joints per ASTM C -443, or a butyl <br />mastic sealant conforming to ASTM C -990. <br />C. Pipe openings shall be provided with a flexible rubber sleeve per ASTM C -923, or shall be made <br />watertight by the contractor with cement mortar, and shall be sized to accept pipes of the specified <br />size(s) and material(s). <br />D. Internal components shall be made of stainless steel, fiberglass, and /or high density polyethylene <br />(HDPE). <br />E. Casting for manhole frames and covers shall be vented and per the governing city's requirements. <br />F. All sections shall be cured by an approved method. Sections shall not be shipped until the concrete <br />has attained a compressive strength of 4,000 psi. <br />2.02 Hydraulic Design <br />The specified stormwater treatment system shall be hydraulically designed for the specific site in which it <br />will be installed. The calibration of the specified system shall account for peak flow rates (supplied to <br />specified stormwater treatment system company by owner /engineer) that correspond with predetermined <br />regional rainfall data to maintain peak removal efficiencies and to not cause upstream flooding or pooling <br />of stormwater. <br />The structural stormwater treatment system shall consist of one round pre -cast concrete structure (D1) <br />with another smaller diameter structure (D2) housed within the main structure D1. The D2 structure <br />should be integrally cast or sealed with a bitumastic sealant to the base of the D1 structure. <br />The D1 structure shall have an on- center, mechanically fastened inlet deflector plate that induces a <br />swirling flow pattern between the D1 and the D2 walls. This area will accumulate, store and retain <br />captured /settled solids deposited by numerous storm events and prevent washout of separated solid <br />pollutants under peak design flow until which time the maximum storage volume of solid contaminants is <br />reached. <br />The D3 internal piping shall be fiberglass or PVC and designed to discharge clean water downstream, <br />while retaining floatable debris within the structure to a defined peak flow rate. <br />TODAY by <br />building forTOMORROW <br />www.royalenterprises.net • 651- 462 -2130 • 800 - 817 -3240 <br />3.09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.