My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/14/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 12/14/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:50:29 PM
Creation date
12/9/2010 9:17:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/14/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
794
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Site Plan Review -Suite Living at The COR <br />December 8, 2010 <br />Page 9 of 10 <br />Stormwater Management Fees. The 2010 rate for Stormwater Management is $448 /unit. <br />Standard stormwater management obligations for this project would be ($448 x 86 units = <br />$38,528). The rate at the time of execution of the Development Permit will be collected. <br />Lighting: The City has received a site lighting plan for review. City standards require that the <br />luminaire (light source) must not be visible from beyond the property line. Any lighting used to <br />illuminate an off - street parking area, sign, or structure shall be arranged to deflect away from <br />Sunwood Drive and Civic Center Drive. The applicant is responsible for the installation and 3 <br />years of operations and maintenance of all boulevard lighting adjacent to their project consistent <br />with the COR master lighting plan. I believe all lighting along Sunwood Drive is complete, with <br />the exception of the proposed impacts associated with this project, but Civic Center Drive is not. <br />Please contact Leo Offerman at Connexus Energy to coordinate the installation of the required <br />lighting. <br />REU Number: This property will be subject to a storm water utility charge based upon the <br />amount of impervious surface on the site. The quarterly charge is dependent upon the number of <br />Residential Equivalent Units (REU) calculated for this property. The plans indicate an overall <br />area 80,639 square feet and an impervious surface calculation of 64,723 square feet (80.3 %). <br />The calculated REU for this project is 7.16, which equates to a quarterly charge of $257.91. <br />The City Council will be meeting at 7:00 pm on Tuesday, December 14, 2010 at the Ramsey <br />Municipal Center, 7550 Sunwood Drive, to review your final site plan. You, or your <br />representative, should be present at the meeting to answer any questions that may arise. <br />If you have any questions, please call our office at (763) 427 -1410 <br />Sincerely, <br />CITY OF RAMSEY <br />Tim Gladhill <br />Associate Planner <br />CC: <br />Landform <br />Attn: Kendra Lindahl, AICP <br />105 South Fifth Street, Suite 513 <br />Minneapolis, MN 55401 <br />Frisbee Architects <br />215 N 2nd St # 204 <br />Tim Himmer <br />City Engineer <br />Chris Anderson <br />Environmental Coordinator <br />Landform <br />Attn: Eric Kellogg <br />105 South Fifth Street, Suite 514 <br />Minneapolis, MN 55401 <br />City of Ramsey BRA <br />Attn: Darren Lazan, Development Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.