My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/14/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 12/14/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:50:29 PM
Creation date
12/9/2010 9:17:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/14/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
794
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. Irrigation metering and backflow devices shall be approved as part of the Utility Plan, and <br />installed accordingly. <br />j. Irrigation rain sensors shall be installed and appropriately placed throughout the <br />development. <br />k. Establishment of turf in areas disturbed during construction and in accordance with the Plat. <br />1. Temporary and permanent erosion control <br />(the "Required Improvements)" <br />The PERMITTEE agrees to construct the Required Improveme <br />conditions of this agreement and in accordance with PER <br />CITY. <br />8. Required Improvements Completion Date. The Requirr <br />before December 14, 2011. <br />9. Required Improvements Financial Guarantee. In order to e ure the installation of tit Required <br />Improvements in accordance with CITY specifications and in a tiqely manner, the PERMITTEE <br />shall be required to deposit with the CITY a cash escrow or letterofcredit, approffe'd as to fonn by <br />the CITY, in the amount of Dollar and No Cents. ($ x 1.50 = <br />$ .00), which is 150% of the CITY's estimated cost of the Required Improvements. <br />Prior to the issuance of the building pernit, all financial guarantees ,mj t be provided as required <br />Upon completion of t <br />returned to the PERMI <br />maintenandapant_ e desc <br />completion of the co <br />consultation with the <br />Required Improvements <br />Required Improvements <br />draw upon the escrow fo <br />completion of the Requ <br />herein. [NOTE: If the Developer has bids <br />than our Engineer's Estimate, the City Engi <br />guarantee. Bids may need to be accepte <br />Improvements Completion e. The Req <br />December 14, 2011 <br />of the Requir - improvements, the financial guarantee shall be <br />I E shall be required to provide the landscaping <br />Para:.. of this Development Permit. The determination of <br />Required Improvements shall be made by the City Council after <br />event the PERMITTEE fails to construct and install the <br />equirea erein, the City Council may order the completion of the <br />CIT day labor and /or by letting contracts for said completion and <br />ayment. Only the City Council shall have the authority to direct <br />Improvements and withdraw from the escrow account. The <br />PERMITTEE hereby gr. permission and a license to the CITY and /or its contractors and assigns <br />to enter upon the Site fe,r the purpose of completing the construction and installation of the Required <br />Improvements in the event of the PERMITTEE's default. <br />10. Inspection Fees. The PERMITTEE shall be responsible for all inspection costs incurred by the <br />CITY related to the installation of Required Improvements. The PERMITTEE shall make a cash <br />deposit into the appropriate escrow account at the CITY and the CITY shall have the authority to <br />draw upon these funds for the purpose of compensating for inspection services. The amount of the <br />deposit shall be equal to five percent (5 %) of the estimated cost of the Required Improvements, <br />which equates to Dollars and No Cents ($ .00) (5% x $ ). Upon <br />completion of the Improvements to the satisfaction of the CITY, any surplus balance remaining in <br />the CITY'S escrow account shall be refunded to the PERMITTEE. <br />Residence at The COR <br />Development Permit <br />Page 3 of 7 <br />rding to the terms and <br />EE'S plans submitted to the <br />ovemen. .11 be completed on or <br />ed improvemen(s that are proven to be lower <br />• e bids, in consideration for the financial <br />gne. e used for this purpose.]Required <br />Improv erents shall be completed on or before <br />
The URL can be used to link to this page
Your browser does not support the video tag.