My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/14/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 12/14/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:50:29 PM
Creation date
12/9/2010 9:17:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/14/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
794
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION II <br />PERMITS AND OCCUPANCY <br />11. Requirements for Building Permits. No building permit for any lot on the Subject Property shall <br />be issued until: (a) a Class 5 driving surface is installed to within 300 feet of the structure; (b) site <br />plan approval is granted by the CITY and any expense incurred in g <br />been reimbursed to the CITY; (c) the Building Official has bee <br />approved site plan, signed by a registered architect or surveyor, sh <br />the Plat has been recorded at Anoka County Property Records <br />Management Organization Pen has been obtained. In as non, t <br />suspend all building activities upon the CITY being notified by a <br />appropriate permit(s) was not obtained from the applica agency. A <br />foundation requires a certificate of elevation signed by a licensed (State of Mi <br />land surveyor, verifying that the elevation with the approved grading plan for th <br />Foundation approvals will require a certificate of elevation verify that the actu <br />compliance with the approved grading and drainage plan. The lowesffloor elevatio <br />2 feet above the 100 year elevation. <br />No occupancy permit for any lot in the Subject Property shall be issued until: (a) vehicular access <br />to the Subject Property is provided including .... tallation of ast one layer of bituminous <br />surfacing; (b) all utilities are in place, operational .. ,� ccepted by e CITY; (c) slope of less than <br />2 %, a certificate of gradin_, prepared by a li. s- - tate of Mineesota), professional land surveyor, <br />must be provided to t. .ocumenting the flattest grade on this lot is 1% or greater will <br />require certificates <br />TI S III <br />APING <br />Residence at The COR <br />Development Permit <br />Page 4 of 7 <br />ng site plan approval has <br />ed with a copy of the <br />g all dimensions to scale; (d) <br />wer Rum River Watershed <br />TY reserves the right to <br />side agency that the <br />al of the building <br />ta), professional <br />t Property. <br />evation is in <br />shall be at least <br />12. tenance Guarantee for ` andscafoing. It is herein agreed that the PERMITTEE shall <br />a maintenance guarantee to ensure the survival of the plantings for the Subject Property, in <br />accordance with the Landscape Pan prepared by Landform Professional Services, LLC, dated <br />October 5, 2010, revised December 3, 2010. Said maintenance guarantee shall consist of cash <br />or a lette credit, approved as to form by the CITY, in the amount of <br />ollars and No Cents ([ trees x $150] + [ shrubs x $75] x 30% non - <br />survival rate = ', .00), which shall be in effect for a two -year period commencing on <br />the date of the C 's acceptance of said plantings as part of the Required Improvements. <br />At the end of the two -year period, the maintenance guarantee shall be returned to the <br />PERMITTEE. The determination that all plantings that have been planted in accordance with the <br />Site Plan have either survived or have been replaced shall be made by the Community Development <br />Department. In the event the PERMITTEE fails to maintain the required plantings for a two -year <br />period, the City Council may order the replacement of plantings with CITY day labor and /or by <br />letting contracts and draw upon the escrow for payment. Only the City Council shall have the <br />authority to direct replacement of the plantings and withdraw from the escrow account. The <br />PERMITTEE hereby grants permission and a license to the CITY and /or its contractors and <br />
The URL can be used to link to this page
Your browser does not support the video tag.