My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/14/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 12/14/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:50:29 PM
Creation date
12/9/2010 9:17:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/14/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
794
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To satisfy the park dedication requirements, City Council agreed to accept the conveyance of Outlot C, equal to <br />4.175 acres of property. The City can either sell the outlot outright for cash to be put back into the park dedication <br />fund, or utilize the land as an additional park which may be necessary for that area. This allows the Council and <br />future Council more flexibility and still fulfills the dedication requirement. It is important to note that the proposed <br />location of the outlot satisfies a need to extend an existing park (Lake Itasca Park) in order to create a safe <br />pedestrian crossing from Lake Itasca/North fork to future development south of Alpine Drive as well as The COR. <br />In addition, there may be a need for additional park land in this area based on proposed densities of residential <br />development and separation by roadways and other barriers to existing parks. This was approved at the preliminary <br />plat stage at the October 26th, City Council meeting. <br />As for satisfying Trail Development obligations, the Applicant proposes a trail on the north side of Bunker Lake <br />Blvd to Puma St and then north to Outlot A along Puma Street. Consistent with the City's comprehensive trail plan <br />and 2030 Comprehensive Plan, an off road trail easement is shown on the northern edge of the wetland on Lot 1 <br />and the southern edge of Outlot A. The cost of the Puma Street trail is approximately $56,400 and the estimated <br />trail fees are $70,000. The applicant has requested that the City Council waive trail fees in return for the <br />construction of the Puma Street Trail. <br />Traditionally, credit to Trail Development Fees has been given when off -site trails are constructed. In this instance, <br />a portion of the trail along the north side of the extension of Bunker Lake Boulevard is on a separate parcel of land, <br />and would be eligible for credit. There would be approximately $12,000 of credit eligible to the applicant for the <br />off -site improvements. Staff would recommend keeping with City policy of charging the trail fees and applying the <br />trail credit. <br />Municipal Water and Sanitary Sewer will need to be extended from Armstrong Blvd to serve the proposed <br />subdivision. The cost of the utility extensions will be paid by the Applicant, with any over - sizing necessary to serve <br />the larger service district being paid by the City's corresponding Utility Funds. Drainage and utility easements must <br />be 10' in width abutting dedicated right -of -way, 5' in width along both side and rear lot lines, and encumber the <br />100 -year flood zone for all existing and proposed surface waters. <br />The site shows 541 parking stalls in phase one and 245 in the second phase for a total of 786. The Bus <br />Parking /loading /limited after -hours parking area is not included in the above counts. Currently, City Code is silent <br />on parking requirements for school uses. Staff believes the number of spaces proposed to be adequate. Upon total <br />site build -out, it will be equal to approximately 3 stalls per 1000 net square feet of building area. <br />Building appears to meet exterior finish requirements, it has a combination of stucco, masonry and precast columns <br />with aluminum storefronts and metal roof (on the hockey rink). Also, various portions of the building are shown to <br />be at 38 and 40 feet in height (gym and classroom roofs, which are flat roofs), which exceeds the maximum <br />allowed building height of 35 feet. The `main' portion of the roof is just under 32 feet in height, but there those two <br />aforementioned areas that are over 35 feet. The temporary dome structure is expected to be less than 65 feet in order <br />be compliant with City code and the applicant has indicated that it will comply. City Council will have to approve <br />the use of the temporary dome structure for part of the year as the material is not permitted by City Code. <br />A tree preservation plan has been submitted and is generally acceptable with comments and changes outlined in the <br />Staff Review Letter. No density transition is required for this project. However, a bufferyard is required around the <br />common property boundary with an existing single family home located on Puma St. The site plan proposes a forty <br />(40) foot wide bufferyard, consistent with City Code, with landscaping. The applicant has requested to seed instead <br />of sod which requires approval of City Council. Staff recommends allowing the seeding everywhere except the <br />boulevard area. <br />Recommendation: <br />
The URL can be used to link to this page
Your browser does not support the video tag.