My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/14/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 12/14/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:50:29 PM
Creation date
12/9/2010 9:17:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/14/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
794
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Staff recommends the following: <br />1. Council approve the site plan and major plat contingent upon City Staff Review Letter Dated December 8, 2010, <br />recognizing that it would incorporate the following: <br />• Council will waive the requirement for sodding the site everywhere except the boulevard area and allowing <br />seeding. <br />• Council will deviate from Council policy on the calculation of fees from gross area to net developable area as <br />outlined in the Staff review letter. <br />• Council will be approving the reduced road section for the last 1,250 of Bunker Lake Blvd. to connect to Puma. <br />• Council will be modifying the policy of requiring devlopments to extend utilities through the entire site by <br />allowing the developer to stop the utilities at the second entrance to the school on Bunker Lake Boulevard. <br />• Council will deviate from Council policy on the calculation of stormwater fees based on the permeable area. <br />• Council finds the building materials acceptable, including the use of the temporary dome structure. <br />Furthermore, Staff recommends not to waive the entire trail development fee, and credit only those portions of trails <br />constructed off -site. <br />Funding Source: <br />All costs associated with reviewing the application are the responsibility of the Applicant and funding for the <br />improvements will be covered in the Feasibility Study covered during the Public Hearing earlier tonight in a <br />separate case. <br />Council Action: <br />Motion to approve the major subdivision plat and the site plan contingent upon compliance with the City Staff <br />Review Letter dated December 8, 2010 and the staff recommendation regarding development fees as noted above, <br />and enter into a development agreement subject to approval and final review of the City Attorney and consistent <br />with the feasibility study. <br />Site Location Map <br />Final Plat <br />Preliminary Plat <br />Staff Review Letter <br />Development Agreement <br />Final Plat Resolution <br />Overall Context Map <br />Phase 1 development <br />Total Buildout <br />Building Elevations <br />Dome Example <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Tim Himmer Tim Himmer 12/09/2010 02:57 PM <br />Brian Olson Brian Olson 12/09/2010 03:40 PM <br />Amber Miller (Originator) Amber Miller 12/09/2010 03:43 PM <br />Kurt Ulrich Kurt Ulrich 12/09/2010 05:31 PM <br />Form Started By: Amber Miller Started On: 12/08/2010 01:11 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.