Laserfiche WebLink
The PERMITTEE shall be responsible for completing the rough grading and providing lot <br />corner stakes prior to the installation of underground utilities as set forth above. <br />Stage I Improvement Financial Guarantee. The PERMITTEE shall provide a financial <br />guarantee to the CITY guaranteeing the construction of the Stage I Improvements and their <br />timely completion. The PERMITTEE shall be responsible for a financial guarantee in the <br />amount of Dollars and No Cents ($ .00), which amount is <br />125% of the City Engineer's estimated cost of Stage I Improvements. The financial guarantee <br />shall be deposited with the CITY at the time of execution of this Contract. Upon completion of <br />Stage I Improvements (including the removal of "temporary" erosion control measures as <br />identified in the approved Grading Plan), acceptance by the CITY, supported by appropriate lien <br />waivers, any surplus remaining balance in the CITY's escrow account shall be promptly refunded <br />to the PERMITTEE. <br />4. Inspection Fees. The PERMITTEE shall be responsible for all inspection costs incurred by <br />the CITY related to the installation of Stage I Improvements. The PERMITTEE shall make <br />a cash deposit into the appropriate escrow account at the CITY, and the CITY shall have <br />authority to draw upon these funds for the purpose of compensating for inspection services. <br />The amount of the deposit shall be equal to five percent (5 %) of the estimated cost of the <br />Stage I Improvements. The PERMITTEE shall be responsible for a cash deposit in the <br />amount of Dollars and No Cents ($ .00). Upon completion of the <br />Improvements to the satisfaction of the CITY, any surplus remaining balance in the CITY's <br />escrow account shall be promptly refunded to the PERMITTEE. <br />5. Installation. Stage I Improvements shall be installed in accordance with the Plans and in <br />accordance with CITY standards, City Code and those plans and specifications which have <br />been prepared by a registered professional engineer presented to the CITY by the <br />PERMITTEE and approved by the City Engineer. The PERMITTEE shall obtain all <br />necessary permits from all agencies before proceeding with construction and the Stage I <br />Improvements. Within thirty (30) days after the completion of the Improvements and before <br />the security is released, the PERMITTEE shall supply the CITY with a complete set of <br />reproducible "As Built" plans developed by a certified engineer. <br />6. Time of Performance. The PERMITTEE shall install all Stage I Improvements by <br />December 8, 2011. The PERMITTEE may, however, request an extension of time from the <br />CITY. If an extension is granted, it shall be conditioned upon updating the security posted <br />by the PERMITTEE to reflect any cost increases. <br />7. Stage I Improvement Warranty Financial Guarantee. In addition to the financial guarantee <br />required by Paragraph 3 above, the PERMITTEE shall also post a Stage I Improvement <br />maintenance guarantee with the CITY. Said maintenance guarantee shall be deposited with <br />the CITY at the time Stage I Improvements are accepted by the CITY and prior to release by <br />the CITY of the financial guarantee required by Paragraph 3 above. The amount of the <br />maintenance guarantee shall be Ten Thousand Dollars and no cents ($10,000.00) or five <br />percent (5 %) of the cost of the Stage I Improvements (5% x $), whichever is greater. Said <br />maintenance guarantee shall be held by the CITY for a one (1) year period from the date of <br />its deposit. This financial guarantee is for the purpose of ensuring that the Stage I <br />Improvements have been constructed in accordance with City standards and may be called <br />upon at the CITY'S discretion during said one (1) year period if the CITY determines it <br />