My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/09/2002
Ramsey
>
Public
>
Agendas
>
Council
>
2002
>
Agenda - Council - 04/09/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:06:25 AM
Creation date
9/3/2003 2:47:53 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/09/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
listed below. Items 2, 5, and 6 may be credited against Park Dedication owed if <br />completed in a timely fashion and to City standards. However, unless agreed to by a <br />separate instrument, these park improvements shall not exceed the cash Park Dedication <br />owed by the DEVELOPER. <br /> <br />Clearing and grading of the site as well as establishment of turf by seeding is the <br />responsibility of the DEVELOPER. <br /> <br />The DEVELOPER shall propose a play field backstop design including <br />installation costs to the CITY. The approved improvement cost shall be deducted <br />from the cash Park Dedication payment. <br /> <br />Co <br /> <br />The play field shall be graded level with a maximum gradient of 2% in any <br />direction. The design will be for the center to be the high point with a 1% slope <br />extending Northwesterly and Southeasterly, from a line drawn between 'home <br />plate' and the outfield beyond 'second base'. <br /> <br />The DEVELOPER shall relocate by tree spade, up to 40 pines prior to, or <br />concurrent with, the clearing and grubbing operation. At least 15 pine trees shall <br />be located within the existing Solstice Park or the additional park space being <br />dedicated. The CITY shall be responsible for mulching and watering any park <br />trees. <br /> <br />The DEVELOPER shall install groupings of River Birch and Quaking Aspen <br />along the bituminous trail to be constructed in the existing and expanded Solstice <br />Park. The approved park landscaping shall be eligible for credit against the cash <br />Park Dedication due. The CITY shall be responsible for watering the trees after <br />the initial mulching and watering at the time of installation. <br /> <br />The DEVELOPER and the City shall collaborate on irrigation for the turfed <br />areas of the new parkland to be dedicated. The DEVELOPER shall propose an <br />irrigation design by July 1, 2002 that meets with City standards. Upon CITY <br />approval of a not-to-exceed cost, and subsequent installation, the above shall be <br />credited against the Park Dedication due. In the event that an irrigation system is <br />not installed by October 1, 2003 the DEVELOPER shall be required to <br />immediately proceed to install a 6" watermain stubbed out 8' feet into the East <br />boundary of the park by the Developer at no expense to the City. This alignment <br />shall be generally in the center of the park and terminate with a hydrant and <br />plugged tee fitting. <br /> <br /> SECTION V <br />PEDESTRIAN TRANSPORTATION <br /> <br />-183- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.