Laserfiche WebLink
-36- <br /> <br />yard, rear yard, and side yard setbacks established in the Industrial district. The Industrial district <br />restricts lot coverage to 35%, the site plan is proposing to construct a total of 15,000 square feet <br />of building space on 4.6 acres, which equates to approximately a 7.5% lot coverage. The site <br />will derive one access point from the extension of 156th Avenue. City Code requires all <br />driveways and off-street parking areas to be paved and finished with B-6/12 concrete curbing. <br />The site plan indicates that the employee/customer parking area and the loading berth area will <br />be surfaced with bituminous pavement. According to the site plan the customer/employee <br />parking area wilt be finished with concrete curbing and the loading berth area will be absent of <br />the required concrete curbing. The applicant would like to construct a future addition within the <br />next 3-5 years that would consist of approximately 25,000-35,000 square feet of <br />office/warehouse space. The applicant would like to deviate fi'om the City Code requirement to <br />install concrete curbing around the perimeter of the loading berth area since they would like to <br />construct a future addition off the rear of the principal building. Deviation from the required <br />concrete curbing will require City Council approval. The proposed development is subject to the <br />review and permitting of the Lower Rum River Watershed Management Organization (WMO). <br />The exterior building materials for the principal structure are proposing to consist of rock face <br />concrete block with a pre-finished metal coping accent; this meets City Code requirements. The <br />landscaping plan is acceptable. The facility will be served by on-site sewer and water facilities. <br />The City adopted the 2001 Comprehensive Plan on December 18, 2001. The Comprehensive <br />Plan includes a general policy stating that new commercial/industrial developments should be <br />serviced by urban services. Since municipal services are not available to the site, staff <br />recommended that the development permit require connection to urban services within 2 years of <br />availability. The Minnesota Department of Transportation has initiated a TH 10 Inten'egional <br />Corridor Management Plan for State Highway #10. Howard R. Green Company made a <br />presentation to the City showing different options for the portion of Highway #10 located in the <br />City of Ramsey. The exact aligmnent of the fi'eeway has not been determined, however MnDOT <br />has stated their preference for the northernmost ali~omnent that would be located immediately <br />adjacent to the BNSF Rail system. The City Council adopted a resolution on January 8, 2002 <br />stating the City's support for the TH 10 Interregional Corridor Management Plan to convert TH <br />10 to a freeway system. It was noted that the adopted resolution does not specify a preferred <br />aligmnent. Converting State Highway #10 to a freeway could have a substantial impact on the <br />property. The applicant is aware of the TH 10 study and has decided to proceed with <br />development plans. The Planning Commission reviewed the proposed site plan on February 7, <br />2002. The Planning Commission recommended approval of the site plan contingent upon <br />compliance with City Staff review letter dated February 21, 2002. <br /> <br />City Attorney Goodrich noted that site plan approval would need to be contingent on <br />Comprehensive Plan amendment, rezoning, and approval of Final plat of Ramsey Industrial Park. <br /> <br />City Engineer Olson noted that staff is recommending that the curb be installed at the loading <br />berth at this time. <br /> <br />City Council/February 26, 2002 <br /> Page 12 of 35 <br /> <br /> <br />