My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/26/2002
Ramsey
>
Public
>
Agendas
>
Council
>
2002
>
Agenda - Council - 03/26/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:06:02 AM
Creation date
9/3/2003 2:58:36 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/26/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-"112- <br /> <br />approved the comprehensive plan amendment request on February 26, 2002 contingent upon <br />approval by the Metropolitan Council. Staff received a letter from Phyllis Hanson of the <br />Metropolitan Council on March 19, 2002 approving the comprehensive plan amendment to <br />change the Iand use designation of the subject property from Places to Shop to Places to Work. <br /> <br />A permit from the Lower Rum River Water Management Organization will be required for the <br />subject project area. <br /> <br />Lot 1 and Lot 2 are proposed to receive public street access via the extens{on of 156'h Lane NW. <br />The extension of 156'h Lane will require construction of the road on a small portion of a drainage <br />and utility easement located in the City of Elk River. It is Sta2'fs understanding that the <br />applicant is coordinating this effort with the City of Elk River. Staff received a letter from Terry <br />J. Maurer an engineer working for the City of Elk River stating their approval for the City of <br />Ramsey to connect the storm water drainage pond with the existing pond in Elk Riverl However, <br />Staff is requesting that tile applicant provide further verification from the City of Elk River <br />regarding the agreement between Elk River and the developer to construct a portion of 156~' Lane <br />on an easement located in the City of Elk River. <br /> <br />The 200I Comprehensive Plan states a general policy that new commercial developments should <br />be serviced with urban utilities. Municipal water and sewer are not available to the site at this <br />time. Therefore, the development agreement has incorporated language requiring parcels to <br />connect to urban services within 2 years of availability. <br /> <br />Recommendation: <br /> <br />Motion to adopt Resolution #02-03- ~)C~to approve the final plat for West Ramsey Industrial <br />Park contingent upon compliance with City Staff Review Letter dated March 22, 2002 and the <br />Developer entering into a Development Agreement with the City. <br /> <br />Motion to deny the final plat for West Ramsey Industrial Park. <br /> <br />Review Checklist: <br />Community Development Director <br />Principal Planner <br />City Engineers <br />Parks and Utilities Supervisor <br /> <br />CC: 03/26/02 <br /> <br />I <br /> ! <br /> <br />I <br />I' <br /> <br />I <br /> <br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />! <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.