Laserfiche WebLink
S <br /> <br />TATEMENT OF WORK CE RT I F I E D <br />STATE OF MI~NESOTA - DEPARTMENT OF TR3LNSPORTATION <br /> <br />MAIN BODY ITEMS (Group Level De~ail) <br /> <br /> Voucher No. !0 Sheet No: <br /> <br /> Item Con~racz Unit Con~rac= Con~rac~ To Da~e To Oa~e Grg Line <br /> Number i~em Unit Price Quan=i=y A~,oun~ Quamti~y Amount No. No. <br /> <br /> 2104.503 REMOVE CONCRETE WALK M2 1.20 30.00 36.00 50.00 60.00 001 0170 <br /> <br />2104.503 REMOVE CONCRETE WALK M2 1.20 10.00 12.00 I1.00 13.20 00~ 0170 <br /> Totals for Proposal Line Number 0170 40.00 $48.00 61,00 $73.20 <br /> <br />2104 .503 REMOVE CONC~RETE DRIVEWAY PAVEME~ M2 5.98 296.00 1,770.08 ~11.00 2,457.78 001 0180 <br /> Totals for Proposal Line Number 0190 296.00 $I,770.O~ 411.00 $2,457.78 <br /> <br />2104,503 REMOVE CONCRETE MEDIAN M2' 5.98 500.00 2,990.00 421.00 2,517.58 001 0190 <br /> <br /> To=als for Proposal Line Num~er 0!90 500.OO $2,990.00 42!.00 $2,5!7.~8 <br /> <br />2104 .503 REMOVE 8ITUMINOUS PAVEME~ M2 <br />2104.503 REMOVE BITUMINOUS PArleMENT M2 <br />2104.503 REMOVE BI%~J~4INOUS PAVEME~FF M2 <br />2104.5~3 REMOVE 8ITI3~4INOUS PAVEME~ M2 <br /> <br /> Totals for Proposal Line Number 0200 <br /> <br />2.39 ~3,150.00 127,028.50 51,567.00 123,245.13 001 0200 <br />2.39 5,970.00 14,268.30 7,356.00 17,~80.84 003 0200 <br />2.39 1,045.00 2,~97.55 896.00 2,141.44 005 0200 <br />2.39 1,010.00 2,413.90 2,017.00 4,820.6~ 007 0200 <br /> 61,175.00 $146,208.25 61,~36.00 $147,788.04 <br /> <br /> 2104.50] REMOVE 8~%//MINOUS ORfVEWAY M2 1.79 2,774.00 4,965.46 2,670.00 4,779.30 001 0210 <br /> <br /> 2104.503 R/~MOV~ BI%-LTMINOUS DRIVEWAY M2 1.79 31.00 55.49 0.00 0.00 003 0210 <br /> <br /> Totals for ProDosal Line Number 0210 2,805,00 $5,020.95 2,670.00 $4,779.30 <br /> <br /> 2104.509 ~MO~ PIPE APRON ~CH 50.00 27.00 1,350.00 27.00 1,350.00 001 0220 <br /> <br /> 2104.509 R~MOVE PIPE APRON ~ 50.0~ 5.00 25~.00 5.00 250.00 003 0220 <br /> <br /> Totals for Proposal Line No,er 0220 ~ 32.00 $1,600.O0 32.00 $1,600.00 <br /> <br />'2t04.509 ~MOVE $EPTIC T~K EA~ 349.78 13.00 4,547.14 ~3,00 4,540,~4 001 0230 <br /> <br /> To,als for Proposal Line Nu~er 0230 13.00 $4,5~7.!4 L3.00 .$4,~47.14 <br /> <br />2104.509 REMO~ PE~ 8~I~E EA~ ~OO.0O 2.00 200.00 2.00 200.00 OOl 0240 <br /> <br />2104.509 REMOV~ PE~ ~I~E ~CH 100.00 2.00 200.00 2.00 200.00 005 0240 <br /> <br /> To,als for Proposal Line Nu~er 0240 4.00 $400.00 4.00 $400.00 <br /> <br />2104.~09 RE~ ~TING ~ 100.00 1.00 100.00 1.OO 100.00 001 0250 <br /> <br />1104.509 R~MOV~ C~TING EACH 10~.0~ 2.00 200.00 2.00 200.00 007 0250 <br /> <br /> Totals for Proposal Line Nu~er 0250 3.~0 $30~.00 3.G~ $300.00 <br /> <br />2104.509 REMOVE DRJ%INAGE STRUCI~JRE EACH <br />2104.509 REMOVE DRJ%iNAGE STRUCI~3RE EACH <br /> <br /> Totals for Proposal Lin~ Number 0260 <br /> <br />300.00 3.00 900.00 3.00 900.00 001 0260 <br />300.00 1.00 300.00 1.00 300.00 003 0260 <br /> 4.00 $1,200.00 4.00 $1,200.00 <br /> <br />LOW S.P. NU~ER ~99-010-03 <br /> <br />FOR WORK.COMPLETED AS OF 02/04/2002 <br /> <br />Contract Nunfoer: Z00516 <br /> <br />! <br />! <br /> <br />-120- <br /> <br /> <br />