|
STATEMENT OF WORK CERTIFIED
<br />
<br /> STATE OF MINNESOTA - DEPARTMENT OF TRANSPORTATION
<br />
<br />MAIN BODY ITEMS (Group Level Detail)
<br />
<br />I Voucher No. 10 Shee~ No: 5
<br />
<br /> I~em Contract Unit Contrac~ Contract To Date To Date Grp Line
<br />m ~N_u~,e_r Item UniE Price Quanti~ Amotul[ Quantity Amount No. No.
<br />
<br /> 2104 . 509REMOVE SIGN EAC~ 14 . 00 75 . 00 1,050 . 00 84 . 00 1,176 . 00001 0270
<br />
<br /> 104.509 REMOVE SIGN EAC~ 14.00' 15.00 210.00 15.00 210.00 003'0270
<br />
<br />I _ Tota.ls for Proposal Line Number 0270 90.0O $1,260.00 99.00 $1, 386.00
<br />
<br />2104.511 SAWING CONCRETE PAVEMENT {FULL M 16.50 5.00 82.50 1.00 16.50 001 0280 · .
<br />1104.$11 SAWING CONCRETE PAVEMENT (FtrLL M 16.50 2.00 33.00 0.00 0.00 003 0280
<br /> Totals for Proposal Line Number 0280 7.00 $115.50 1.00 $16.50
<br />
<br />1 ~-104.513 SAWING BIT PAVEMENT (FULL DEP~4) M 9.85 389.00 3,83!.65 314.60 3,098.~I 001 e29~
<br /> ~,104.513 SAWING BIT PAVE[~ENT (FULL DEPTH) M 9.85 41.00 403.85 13.00 128.05 003 0290
<br />
<br /> ,)-104.513SAWING BiT PAVEMENT (FULL DEPTH) M 9.85 77.00 758.45 0.00 0.00 005 0290
<br />
<br /> 2104.513 SAWING BIT PAVEMENT {FULL DEPTH) M 9.85 405.00 3,959.25 100.00 985.00 007 0290
<br />W . Totals for Proposal Line Number 0290 912.00 $8,983.20 427.60 $4,211.86
<br /> 2104.523 SALVAGE SIGN TYPE C EACH 14.00 5.00 70.00 4.00 56.00 001 0300
<br />
<br />I To~oals for Proposal Line Number 0300 5.00 $70.00 4.00 $56.00
<br />
<br /> 2104.523 SALVAGE SIGN TYPE O ~CH 20.00 3.00 60.00 2.00 40.00 001 0310
<br /> Totals ~or Proposal Line Number 0310 3.00 $60.00 2.00 $40.06
<br />
<br /> Totals for Proposal Line Number 0320 ~3.00 $20,800.00 19,00 $30,400.00
<br />
<br /> .105.501 CO~MON EXCAVATION (P) M3 3.92 ~ 39,517.00 154,906.64 41,267.00 161,766.64 001 0330
<br /> 2105.501 COMMON EXCAVATION (P) M3 3.92 12,175.00 47,726.00 12,175.00 47,726.08 003 0330
<br /> 105.501 CO~LMON EXCAVATION (P) M3 3.92 2,~86.00 · 11,313.12 3,01~.00 11,799.20 005 0330
<br /> To~als for Proposal Line Number 0330 54,578.00 $213,945.76 56,452.00 $221,291.84
<br />
<br /> 2105. 505 MUCK EXCAVATION M3 4.25 6,940.00 29,495.00 7. 870.00 33,447.50 001 0340
<br /> 105.505 MUCK EXCAVATION M3 4.25 796.00 3,383.00 1,016.00 4,318.00 005 0340
<br /> Totals for Proposal Line Nu~d~er 0340 7,736.00 $32,8.78.00 8,886.00 $37,765.50
<br />
<br /> 105.507 SUBGR/kDE EXCAVATION M3 3.92 31,420.00 123,166.g0 32,167.00 127,270.64 001 0350
<br /> 105. 507 SUBGP~ADE EXCAVATION M3 3.92 2,287.00 8,965.04 2,287.00 8,965.04 003 0350
<br /> 2105.507 SUBGRADE EXCAVATION M3 3.92 561.00 2,199.12 561.00 2,199.12 005 0350
<br /> Totals for Proposal Line Number 0350 34,268.00 $%34,330.56 35,315.00 $1381434.80
<br />
<br /> 105.522 SELEC'C GR3~ BORROW (LV) ~43 5.77 28,710.00 165,656.70 18,726.00 108,049.02 00i 0360
<br /> M3 5.77 3,359.00 19,381.43 1,711.00 9, 872.47 003 0360
<br /> M3 5.77 2,563.00 14,788.51 0.00 0.00 005 0360
<br />
<br />2105.522 SELECT GR3%b~/LAR BORROW (LV)
<br />105,522 SELECT GRA/~fLAR BORROW ILV)
<br />
<br />LOW S.P. N~R4BER 199-010-03
<br />
<br />FOR WORK COMPLETED AS OF 02/04/2002
<br />
<br />Contract Nu~er: Z00S16
<br />
<br />-121-
<br />
<br />
<br />
|