Laserfiche WebLink
I <br /> <br />I <br />I <br /> <br /> STATE OF MI~ESOTA - DEP~TMENT OF TRA/qSPORTATION <br />STATEMENT OF WORK CERTIFIED <br /> <br />WORK ORDER/MINOR EXTRA WORK <br /> <br />'l <br /> <br />I <br />I <br />I <br /> <br /> Voucher No. 10 Sheet No: 29 <br /> <br />i~em Contract Unit Unit Mult To Date To Date Grp Fed <br /> Number Item Price Factor Quantity Amount No. PAR/NON <br /> <br /> Work order/Minor extra ~ork 001 .......................................................................................... <br />I T~ HOUSE REMOVALS DID NOT MENTION ANY FUEL TANKS. T~E CONTP, ACTOR WILL <br /> TWO (2} FLIEL TANK REMOVA/~S LS-$ 1.00 1.000000 2,970,00 2,970.00 001 <br /> <br /> Total for Work order/Minor extra work: 001 = $2,970.08 <br /> <br /> work order/Minor e:~tra work 002 .................................................................................................... <br /> <br />THE ORIGINAL5 PROVISIONS FOR THE FIELD OFFICE DID NOT INCLUDE A <br /> <br /> MITA Ai-15LSF Of GITA~L IMAGING SYSTEM LS-$ !.00 1.000000 5,557.00 5,357.00 001 <br /> Total for Work order/Minor extra work: 002 = $5,357.00 <br /> <br />Work order/Minor e:¢tra work 003 .................................................................................................... <br /> <br />I T <br /> HE HOUSE REMOVALS DID NOT INCLUDE REMOVAL <br /> <br /> ASBESTOS TEST & REMOVAL LS-$ 1.00 1.000000 10,692.00 10,692.00 001 <br /> <br /> Total for Work order/Minor extra work: 003 = $10,692.00 <br /> <br />I Work order/Minor extra ~ork 005 .................................................................................................... <br /> <br /> THE CONTRACTOR IS DIRECTED TO INSTALL A WORK ZONE SPEED LIMIT FOR T}{E <br /> <br /> WORK ZONE SPEED LIMIT UNIT DAY 164.13 1.000000 105.00 17,233.65 001 <br /> Total 'f*or Work order/Minor extra work: 005 = $17,233.65 <br /> <br /> Work order/Minor extra work 006 <br /> <br />I <br /> <br /> DURING THE PAVING OPERATIONS IT WAS NOT POSSIBLE TO PUT T~E RIGHT TURN <br /> <br /> PAVEMENT MESSAGE (R~GHT ARROW) EPOXY ~ACI{ 1Z0.00 1.000000 6.00 720.00 001 <br />I PRIME CONTRACTOR 10% ALLOWANCE LS-$ 1.00 1.000000 72.00 72.00 001 <br /> <br /> Total for Work order/Minor extra work: 006 = $792.00 <br /> Work order/Minor extra work 007 .................................................................................................... <br /> <br />I <br />I <br /> <br />THE CITY OF RAMSEY REQUIRES TFJkT GATE VALVES BE INSTALLED WHEN TYING <br /> <br /> 10" RW GATE VALVE KACH 654.58 1.000000 2.00 1,309.16 007 <br /> <br /> 10" ADAPTER-RW GATE VALVE 63.65 1.000000 2-00~ 127,30 007 <br /> <br /> CONTRACTOR'S 15% FOR blATERIAL LS-$ ~.00 1.000000 215.47 215.47 007 <br /> <br /> Total for Work order/Minor extra work: 007 = $1,651.93 <br /> <br />Work order/Minor e~tra work 008 ......................................................................... ~ .......................... <br /> <br /> T}{E BRACKETING FOR INTERNALLY LIT TYPE D SIGNS NEEDED TO 8E CHANGED TO <br /> <br /> SIGN-FIX BRACKETING EACH 150.00 1.000000 8.00 1,200.00 001 <br /> 1.000000 2.00 300.00 005 <br /> <br /> 1.000000 2.00 300.00 007 <br />I LOW S.~. NU~ER 199-010-03 FOR WORK COMPLETED AS OF 02/04/~002 Contract Number~:--~0516 <br /> -14b- <br /> <br /> <br />