Laserfiche WebLink
PAY ESTIMATE NO. 3 <br /> <br />ENGINEER <br /> <br /> Estimated Contract Unit Price Contract Amount Used to Date Extension <br />No. Sp~c. Ref. Description .. <br /> <br /> 9 2211.501 Aggre, gate Base C~ass 5 809 TON $g.00 TON $7,281.00 $ <br /> 10 234(~.508 Type 41 Wearing Course Mixture 198 TON $47.00 TON $9,306,00 $ <br /> 11 2340.51 Type 31 Binder Course Mixture 13 TON $130.00 TON $1,690.00 $ <br /> 12 234~).514 Type 31 Base Course Mixture '13 TON. $130.00 TON ., , $1,69.0.00 <br /> 13 2357.502 Bituminous Material for Tack Coat 10 GAL $10,00 GAL $100.00 $ <br /> 14 2411.507 Concrete Weir 1 EA , .$1,000,00 EA $1,000,00 <br /> 15 2501.620 I~i'k Heads 5 EA $200.00 EA $1,000,00 $ <br /> 16 2503.541 18" Corrugated Polyethylene Pipe ~ ~ LF $27.00 LF $432.00 $ <br /> 17 2503.541 24" .Corrugated Polyethylene Pipe ~ 787 LF $24.00 LF $18.:888.00 <br /> 18 2503.541 30" Corrugated Polyethylene Pipe ' 438 LF $33.00 LF ,. $14,454-00 $ <br /> 19 2503.541 36" Corrugated Polyethylene Pipe ~ _722 LF $38.00 LF $27,436.00 <br /> <br /> 20 2503.541 36" RC Jacking Pipe (Install by Jacking) 56 LF $350.00 LF $19,600,00 <br /> <br /> 21 2503.541 36" RC Jacking Pipe(Install by Open Cut) 8 LF $125.00 LF $1,000.00 $ <br /> 22 2506.501 Const~ct Orainage.S!.ructure O. esign - 60 ~ 34.68 LF $230.00 LF $7,976,40 <br /> 23 2506.501 Construct Drainage Structure Oesign- 72 ~ 11.32 LF $300.00 LF ,. $3,398-00 $ <br /> 24 2508.501 Construct Drainage Structure Design - 84 ~ 8.42 LF $400.00 LF $3.368,00 $ <br /> 25 2506.802 Connect to Existing Catch Baron 2 EA $200.00 EA $400.00 $ <br /> 26 2506.602 Casting Assemblies. Type 1 5 EA $200.00 EA $1,000:00 $ <br /> 27 2506.602 Casting Assemblies Type 2 I EA _ $500.00 EA $500.00 ., $ <br /> <br /> 28 2563.601 Traffic Control I LS $1,000.00 LS $1,000.00 <br /> <br /> 29 2573.501 Bale Check ", 20 EA $10.00 EA $200.00 <br /> 30 2573.603 Silt Fence 50 LF $2.00 LF $100.00 $ <br /> 31 2575.609 Turf Establishment ,, 1.5 ACRE $2,000.00 ACRE $3,000,00 $ <br /> <br />I <br />I <br /> <br />Total Bid Schedule "B" <br /> <br />SUMMARY OF BIOOING; <br />8id Schedule "A" - Phase 1 Construction <br /> <br />Bid Schedule 'B" - Phase 2 Construction <br /> <br />Total Contract Amount <br /> <br />Total Used To-Date <br /> <br />Less 5% Retainer <br /> <br />Less Pay Estimate No 1 <br /> <br />Lass Pay Estimate No 2 <br /> <br />Less Railroad Insurance <br /> <br />We Recommend Payment of: <br /> <br />Revised per Supplemental Agreement No. 1. <br /> <br /> \,¢1a0 l~,s~ areal docs~municipal\aramsey~ra417pe2.xls <br /> <br />-130- <br /> <br />$136,588.40 <br /> <br />$128,929.20 <br />$136,588.40 <br />$265,517.60 <br /> <br />110,247.20 <br /> <br />$t10,247.20 <br />$5,512.36 <br />$38,984.94 <br />$33,72S. 00 <br />$800.00 <br />$31,254.~0 <br /> <br />3/7/01 <br /> <br /> <br />