Laserfiche WebLink
S TA T E M EN T O F WORK C E RT I F I E D <br /> <br />STATE <br /> <br />OF MINNESOTA ~ DEPARTMENT OF TRANSPORTATION <br />MAIN BODY ITEMS (Group Level Detail) <br /> <br />Toucher No. 6 Sheet No: 12 <br /> <br />item Contract Unit Contract Contract To Date To Date Grp Line <br />~um~er Item Uni~ Price Quantity Amount. Quantity A~ount No. No. <br /> <br />~26.5~2 CONST DRAINAGE STRUCITJRE DESIGN SPEC EACH 3,750.00 1.00 3,750.00 1.00 3,750.00 002 1060 <br /> <br /> Touals for Proposal Line Humber 1060 1.00 $3,750.00 1.00 $3,750.00 <br /> <br />5~.5!6 CASTING ASSEM]SLY EACH 470.00 104.00 48,880.00 llS.00 54,050.00 002 1070 <br />558.516 CASTING ASSE~bY EACH 470.00 4.00 1,880.00 4.00 1,880.00 004 1070 <br />506.5!6 CA.STING ASSEmbLY EACH 470.00 10.00 4,700.00 12.00 S,640.00 006 1070 <br />556.5!6 CA~TING ASSEmbLY EACH 470.00 13.00 6,110.00 0.00 0.00 007 1070 <br />Totals for Proposal Line Number 1070 131.00 $~$,570.00 131.00 $61,570.00 <br /> <br />50~,522 A/)OTJST FRAME & RING CASTING EACH <br /> <br /> Totals for Proposal Line Number 1080 <br /> <br />300.00 <br /> <br />11.00 3,300.00 10.00 3,000.00 001 1080 <br />11.00 $3,300.00 10.00 $3,000.00 <br /> <br />:596.602 CONNECT INTO EXISTING MA2~HOLE. EACH 720.00 2.00 1,440.00 2.00 1,440.00 007 1090 <br /> Totals for Proposal Line Number 1090 2.00 $1,440.00 2.00 $1,440.00 <br /> <br />!506.60~ CONSTRUCT S~ITARY MA/~HOLE SPECIAL EACH 1,645.73 11.00 18,103,03 10.00 16,457.30 00~ 1100 <br /> Totals for Proposal Line Number i100 11.00 $18,103.03 10.00 $16,457.30 <br /> <br />:5~6.603 CONSTRUCT SANITARY M~OLES N <br /> Totals for Proposal Line Number 1110 <br /> <br />268.87 <br /> <br />14.00 3,764.18 10.94 2,941.43 007 1110 <br />14.00 $3,764.18 10.94 $2,941.43 <br /> <br />!506.603 RECONSTRUCT S~.NITARY MA/~HOLES M <br /> Totals for Proposal Line Number 1120 <br /> <br />S00.00 <br /> <br />4.90 2,450.00 8.24 4,120.00 001 1120 <br />4.90 $2,450.00 8.24 $4,120.00 <br /> <br />1511.~01 RANDOM RIPP~AP CLA~S III M3 73.08 62.10 4,538.26 58.20 4,253.25 002 1130 <br /> Totals for Proposal Line Number 1130 62.10 $4,538.26 58.20 . $4,253.25 <br /> <br />~21.501 75 ~4M CONC~ETE WALK M2 21.26 4,085.00 86,847.10 2,317.00 49,259.42 0Gl 1140 <br />521.501 75 MM CONCRET~ WALK M2 21.26 398.00 8,461.48 269.00 5,718.94-003 1140 <br />Totals for Proposal Line Number 1140 4,483.00 $95,308.58 2,586.00 $54,978.36 <br /> <br />521.501 100 ~ CONCRETE WALK M2 22.38 139.00 3,110.82 0.00 0.00 001 1150 <br />521.501 100 MM CONCRETE WALK M2 22.38 709.00 15,867.42 2,011.00 45,.006.18 005 1150 <br />Totals for Proposal Line Number 1150 848.00 $18,978.24 2,011.00 $45,006.18 <br /> <br />52~,501 160 M~4 CONCRETE WAlK M2 29.66 43.00 1,275.38 47.30 1,402.91 001 1160 <br />521.501 150 M~ CONCRETE WALK M2 29.66 12.00 355.92 13.70 406.34 003 1160 <br />Totals for Proposal Line Number 1160 55.00 $1,631.30 61.00 $1,809.26 <br /> <br />I <br />I <br />I <br />I <br /> <br />OW S.P. Nq3MBER 199-010-03 <br /> <br />FOR WORK COMPLETED ;kS OF 12/21/2000 <br /> <br />Contract Number: Z00516 <br /> <br />-158- <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br />[' <br /> <br /> <br />