Laserfiche WebLink
S TAT E M ENT O F WORK C E RTI F I.E D <br /> <br />STATE OF MINNESOTA - DEPARTMENT OF TRANSPORTATION <br /> <br />MAIN BODY ITEMS (Group Level Detail) <br /> <br />Voucher No. 6 Sheet No: 13 <br /> <br />item Unit Contract Contract To Date To <br /> Contract <br /> Date <br /> Grp <br /> Line <br /> <br /> umber Item Unit Price Quantity Amount Quantity Amount No. NO. <br /> <br /> I ,~1.511 50 MM BITUMINOUS WALK M2 6.30 2,965.00 18,679.50 3,020.00 19,026.00 001 1170 <br /> <br /> Totals for Proposal Line Number 1170 2,965.00 $18,679.50 3,020.00 $19,026.00 <br /> <br /> J 31.501 CONCRETE CURB & GtrrTER DESIGN 8412 M 21.28 428.00 9,107.84 355.00 7,554.40 003 1180 <br /> <br /> Totals for Proposal LAne Number 1180 428.00 $9,107.84 355.00 $7,554.40 <br /> <br /> .531.501 CONCRETE CURB & GUTTER DESIGN 8418 M 24.79 168.00 4,164.72 165.00 4,090.35 003 1190' <br /> I Totals for Proposal Line Number 1190 168.00 $4,164.72 165.00 $4,090.35 <br /> :531.501 CONCRETE CURS & GU~q'ER DESIGN 8424 M ' 26.10 8,515.00 222,241.50 8,517.00 222,293.70 0Ol 1200 <br /> <br /> I Totals for Proposal Line Number 1200 8,515.00 $222,241.50 8,5t7.00 $222,293.70 <br /> <br /> .~531.501 CONCRETE CURB & GUTTER DESIGN 8618 M 22.85 1,096.00 .25,043.60 1,038.00 23,718.30 001 1210 <br /> <br /> i 31.501 CONCRETE CURB & GUTTER DESIGN 8618 M 22.85 886.00 20,245.10 840.00 19,194.00 005 1210 <br /> <br /> 2531.502 CONCRETE CLP~B DESIGN S5 M 35.70 84.00 2,998.80 83.00 2,963.10 001 1220 <br /> I Totals for Proposal Line Number 1220 84.00 $2,998.80 83.00 $2,963.10 <br /> <br /> 2531.507 200 MM CONCRETE DRIVEWAY PAVEMENT M2 42.84 228.30 9,780.37 0.00 0.0O 0Ol 1230 <br /> 5 Totals for Proposal Line Number 1230 228.30 $9,780.37 0.00 $0.00 <br /> ,40.602 MAIL BOX SUPPORT EACH 125.00 4.00 500.00 4.00 500.00 001 1240. <br /> <br /> Totals for Proposal Line Number 1240 4.00 $500.00 4.00 $500.00 <br /> <br /> 345.509 CONDUIT SYSTEM (SIGNALS) LS 14,362.00 0.80 11,489.60 0.80 11,489.60 001 1250 <br /> 2545.509 CONDUIT SYSTEM (SrGNALS) LS 14,362.00 0.10 1,436.20 0.10 1,436.20 003 1250 <br /> 545.509 CONDUIT SYSTEM (SIGNALS) ~LS 14,362.00 0.10 1,436.20 0.10 1,436.20 005 1250 <br /> Totals for Proposal Line Nu~ber 1250 1.00 $14,362.00 1.00 $14,362.00 <br /> <br /> 554.509 GUIDE POST TYPE B EACH 37.00 38.00 1,406.00 24.00 888.00 002 1260 <br /> 554.509 GUIDE POST TYPE B EACH 37.00 5.00 I85.00 5.00 185.00 004 1260 <br /> <br /> 554.509 GUIDE POST TYPE B EACH 37.00 4.00 148.00 0.00 0.00 006 1260 <br /> Totals for Proposal Line Number 1260 47.00 $1,739.00 29.00 $1,073.00 <br /> <br /> 557.603 WOODEN FENCE M 36.50 278.00 10,147.00 0.00 0.00 001 1270 <br /> Totals for Proposal Line Number 1270 278.00 $10,147.00 0.00 '$0.00 <br /> <br /> ~557.603 BARBED WIRE FENCE ~ 16.50 '220.00 3,630.00 248.00 4,092.00 001 1280 <br /> <br /> Totals for Proposal Line Number 1280 220.00 $3,630.00 248.00 $4,092.00 <br /> <br />IOW S.P. NUMBER 199-010-03 FOR WORK COMPLETED AS OF 12/21/2000 Contract Number: Z00516 <br /> <br />-159- <br /> <br /> <br />