Laserfiche WebLink
-204- <br /> <br />T&G Land Inc. <br />Page 4 of $ <br />December 29, 2000 <br /> <br />The storm sewer proposed along the western lot line of the proposed development could in the <br />future be turned over to He City of Ramsey and should have the appropriate drainage and utility <br />easements. The sizing of this pipe for potential use of draining neighboring developments, which <br />will provide a regional benefit, shall be coordinated with the City of Ramsey. The use of RCP or <br />PVC pipe would ensure a water and soil tight joint and should be used under pavement. Since the <br />durability and age of the Corrugated Polyethylene Pipe is unproven, it is the recommendation of <br />this City Engineer to. disallow the use of CPP for storm sewers that could potentially be turned <br />over to the. City of Ramsey. . <br /> <br />The east-west (CBMH 506 - CBMH 500 & STMH 406 - CBMH 400) laterals along with the <br />catch basins that will drain the recycled aggregate surface (CBMH'200i & CBMH I00l) that are <br />being proposed will be considered private utilities with maintenance to be provided for by the <br />developer. <br /> <br />Since the maintenance of the pond will be bore by the City of Ramsey, we expect that the sump <br />manholes that are being proposed to drain the recycled bituminous surface are cleaned regularly. <br />A performance specification to address long-term effectiveness of the proposed erosion control <br />for the sumps and grading will be written as a condition of' approval. <br /> <br />All storm sewer outlets shall have trashguards and Class III rip-rap installed according to City <br />standard, details. Rip,rap shall be used for the emergency spillways and a detail should be <br />submitted. <br /> <br />Drainage patterns and impacts to neighbors to the east of the proposed metal building should be <br />clarified. <br /> <br />Access: The site will derive two access points from the westerly extension of 141~t Avenue and <br />will be dedicated as a public street. <br /> <br />Storm Water Management Fee: The Stormwater Management Fee will be waived for this site <br />due to the City relocating T & O Land Inc. from its current location into Gateway North <br />Industrial Park No. 5 to facilitate an industrial redevelopment project on Sunfish Lake Blvd. and <br />McKinley Street. <br /> <br />REU Number: The City has assigned the property a Residential Equivalent Unit (tLEU) number <br />of 3.43. The quarterly drainage utility charge wilt be nine hundred seventy one and fifty'four <br />cents ($971.54) (11.24 acres x $25.20/quarter). <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />