Laserfiche WebLink
10. <br /> <br />11. <br /> <br />12. <br /> <br />STOILMWATER MANAGEMENT FEE. The CITY has enacted a Stormwater <br />Management Fee in the amount of Three Thousand Six Hundred Fifty Eight Dollars <br />($3,658.00) per commercial acre. The Site size for stormwater management calculation <br />purposes will not include the area occupied by the stormwater detention pond. The <br />amount of Stormwater Management Fee due on the Site is Seven Thousand Nine <br />Hundred Seventy Four Dollars and no cents ($7,974.00) (2.18 acres x $3,658/acre). A <br />cash payment will be required prior to the CITY releasing the Building Permit. <br /> <br />FIRE LANES. Fire lanes shall be maintained on the Site. The exact location of these <br />items on the Site shall be as directed by the City's Fire Chief. <br /> <br />LIGHTING. Any lighting installed on the structure or in the parking lot is subject to the <br />prior approval of the City Engineer and shall be designed so as to deflect light away from <br />T.H. #47 and the service road. Bulbs emitting in excess of 3,000 lumens (I50 watts) <br />shall be so directed that the bulb is not visible from off of the property where such light <br />source is located , <br /> <br />BUILDING FACADE. The Permit-tee agrees to face the Structure with a combination of <br />rock face block, face br/ck, stucco, and pre-cast concrete stone ledges in accordance with <br />the Exterior Elevations prepared by Lampert Architects, dated April 13, 2000, revision <br />date May 2, 2000, issue date June 15, 2000. <br /> <br />REQUIREMENTS FOR BUILDING PERMIT AND CERTIFICATE OF <br />OCCUPANCY. No building permit for. the Site will be issued until the permittee has: a) <br />signed and returned this Development Permit; b) provided the required cxsh payment for <br />trunk sewer and water services in accordance with Item #6 of this Permit; c) provided the <br />required cash payment for stormwater management in accordance with Item #6 of this <br />Permit; and d) provided the required financial guarantee in accordance with Item #12 of <br />this Permit. No Certificate of Occupancy for the structure will be issued until the <br />Required Improvements. are. accepted by the City and the landscaping maintenance <br />guarantee has been provided in accordance with Item #13 of this Development Permit. <br /> <br />IMPROVEMENT CONSTRUCTION SCHEDULE. The Required Improvements <br />shall be completed before December 31, 2000. <br /> <br />ESCROW FOR REQUIRED IMPROVEMENTS. <br /> <br />In order to insure the installation of the Required Improvements in accordance with City <br />specifications and in a timely manner, the Permit-tee shall be required to deposit with the <br />City a cash escrow or letter of credit, approved as to form by the City, in the mount of <br />Eighty Seven Thousand Dollars and no cents ($87,000.00), which is 150% of the City's <br />estimated cost of the Improvements. Prior to the issuance of the building permit, all <br />financial guarantees must be provided as required herein. <br /> <br />I <br />I <br />I <br />I <br />I' <br /> <br /> I <br /> <br />I <br />I <br />I <br />I <br />t <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />