Laserfiche WebLink
PAY ESTIMATE NO. 2 <br /> <br />ENGINEER <br /> <br />No. Spec. Ref. Description Estimated Contract Unit P,ri..c~ Contract Amount I Used to Date Extension <br /> 9 2211.501 Aggregate Base C ass 5 809 TON $9.08 TON $7,281.00!_ <br /> 10 2340.508 Typ~ 41 Wearing Course Mixture 198 TON $47.00 TON $9,306.00~ $ <br /> 11 2340.51 Type 31 Binder Course Mixture 13 TON $130.00 TON $1,690.00 $ <br /> 12 ~'340.514' Type 31 Base Course Mixture 13 TON $130.00 TON $1,690.00 $ <br /> 13 2357.502 Bituminous Material for Tack Coat 10 GAL $10,00 GAL $100.00 $ <br /> ~.,' 2411.507 Concrete Weir I EA $1,000.00EA $1,000.00 $ <br /> 15 2501,620 Bulk Heads 5 EA $200.00 EA $1,000.00~ $ <br /> 16 2503,541 i18" Corrugated Polyethylene'Pipe ~ 16 LF $27.00 LF $432.001 $ <br /> 17 2503.541 24" Corrugated Polyethylene Pipe.~ 787 LF $24.00 LF $18,888.0C $ <br /> 181 2503.541 30" Corrugated Polyethylene Pipe ~ 438 LF $33.00 LF $14,454.00 $ <br /> 19 2503.541 36', Corrugated Pol. y.ethylene Pipe ~ 722 LF $38,00 LF $27,436,00 $ <br /> 20 ~-5-~3.541 36,, RC Ja,.cki.ng Pipe (Install by Jacking) 56 LF $35~i00 LF $19,600.00 $ <br /> 21 2503.541. 36" RC Jacking Pipe (Install by Open Cut) 8 LF $125.00 LF $1,000.00 $ <br /> 22 2506.501 C~._nstruct Drainage Structure D.esign - 60 ~ 34.68 LF $230,00 LF $7,976.40 $ <br /> 23 2506.501._. Cor, struct Drainage Struct.ur_e Design - 72 ~ 11.32 LF $300.00 LF $3,396.00 $ <br /> 24 2506.501 Construct Drainage Structure Desi,gn ~ 84 ~ 8.42 LF $400.00 LF $3,368.00 $ <br /> 25 2506.602 Connect to Existing Catch Basin 2 EA $200.00 EA $400,00 $ <br /> 26 2506.602 Casting Assemblies Type 1 5 EA $200.00 EA $1,000,00 $ <br /> 27 2506.602 Casting Assemblies Type 2 I EA $500.00 EA $500.00 $ <br /> 28 2563.601 Traffic Control 1 LS $1,000.00 LS $1,000.00 $ <br /> 29 2573.501 Bale Check '" <br /> 20 EA $10.00 EA ., $200.00 $ <br /> 30 2573.603 Silt Fence 501LF $2.00 LF $100.00 $ <br /> 31 2575.6f')9 Turf Establishment 1.5 ACRE $2,000.00 ACRE $3,000.00 $ <br /> <br />Total Bid Schedule "B" <br /> <br />SUMMARY OF BIDDING: <br />Bid Schedule "A"- Phase I Construction <br /> <br />Bid Schedule "B"- Phase 2 Construction <br /> <br />Total Contract Amount <br /> <br />Total Used To-Date <br /> <br />Less ,5% Retainer <br /> <br />Less Pay Estimate No 1 <br /> <br />We Recommend Payment of: <br /> <br />$136,588.40 <br /> <br />$128,929.20 <br />$136,588.40 <br />$265,517.60 <br /> <br />$ 76,505.20 <br />$ <br /> <br />$76,505.20 <br />$3,825.26 <br />$3g,954.94 <br />$33,725~00 <br /> <br />Revised per Supplemental Agreement No. 1. <br /> <br />\~aOl\shared docs~m unicipar~aram sey~ra417pe.xls <br /> <br />2~6~01 <br /> <br /> I <br /> I <br /> I <br /> I <br />I' <br /> I <br /> I <br /> i <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />