|
PAY ESTIMATE NO, 5 ENGINEER
<br />Improvement Projects 99-66, 99-68 and 00-28
<br />
<br />I
<br />I
<br />
<br /> I
<br />
<br /> I
<br /> I
<br /> I
<br />
<br /> I
<br /> I
<br />,Il
<br />
<br /> I
<br />
<br />Schedule "C" - Improvement Projecl 00-28, 142nd Ave. NW
<br />
<br />Item Estimated
<br />No. Spec, Ref, Description Quantity Unit Price Extension Used to Date Extension
<br />1 2101,502 IClearing 1 TREE $ 300.00 TREE $ 300.00 3 $ 900.00
<br />2 2101.507 Grubbing 1 TREE $ 300.00 TREE $ 300.00 3 $ 900.00
<br />
<br />3 2104,505 Remove Bituminous Pavement 3258 SY $ 2,00 SY $ 6,516.00 3471.9 $ 6,943.80
<br />4 2104,513 Sawing Bituminous Pavement(Full Depth) 936 LF $ 3,00 LF $ 2,808.00 1109.1 $ 3,327.30
<br />5 2104.521 Salvage & ReinstalIWood Rail Fence 2 EACH $ 500.00 EACH $ 1,000.00 2 $ 1,000.00
<br />6 2104.602 Relocate Tree 3 EACH $ 300.00 EACH $ 900.00 3 $ 900.00
<br />7 2105,501 Pond Excavalion 1 LS $ 3,000,00 LS $ 3,000.00 1 $ 3,000.00
<br />8 2105,521 Gra.nular Borrow, LV 20 CY $ 15.00 CY $ 300.00 0 $
<br />9 2105.525 Topsoil Borrow, LV 180 CY $ 10.00 CY $ 1,800.00 47 $ 470.00
<br />10 2105.609 Geotextile FabdcType IV 35 8Y $ 4.00 SY ; $ 140.00 34 $ 136.00
<br />11 2211.501 Aggregate Base Class 5 865 TON $ 8.00 TON $ 6,920.00 865 $ 6,920.00
<br />12 2340.508 Type 41 We~dng Course Mixture 15 TON $ 34.00 TON $ 510.00 36.25 $ 1,232.50
<br />13 2340.514 Type 31 Base Course Mixture 317 TON $ 34.00 TON $ 10,778.00 403.18 $ 13,708.12
<br />
<br />14 2501.515 18"CMPipeApmn 1 EACH $ 150:00 EACH IS 150.00 1 $ 150.00
<br />
<br />15 2503,511 15" Corrugated PE Pipe (CPP) 962 LF $ 20.00 LF $ 19,240.00 662 $ 13,240.00
<br />16 2503.511 18" Corrugated PE Pipe (CPP) 713 LF $ 25.00 LF : $ 17,825.00 713 $ 17,825.00
<br />17 2506.501 Construct Drainage St~cture Design 48 - 4020 35.3 LF $ 170.00 LF $ 6,001.00 34.49 $ 5,863.30
<br />
<br />18 2506,509 Construct Catch Basin - 2' x 3' 5 EACH $ 450.00 EACH is 2,250.00 5 $ 2,250.00
<br />
<br />19 2506.522 Adjust Frame & Ring Casting 1 EACH $ 200.00 EACH $ 200,00 2.5 $ 500.00
<br />20 2506.602 Casting Assemblies Type 1 I EACH $ 250.00 EACH $ 250.00 1 $ 250.00
<br />
<br />21 2506.602 Casting Assemblies Type 2 9 EACH $ 280.00 EACH $ 2,520.00 9 $ 2,520.00
<br />
<br />22 2506.602 Casting Assemblies Type 3 1 EACH $ 200.00 EACH $ 200.00 1 $ 200.00
<br />23 2511.501 Random Riprap Class II 7.5 CY $ 50.00 CY $ 375.00 13.2 $ 660.00
<br />24 2535,501 Bituminous Curb 1405 LF $ 0.80 LF iS 1,124.00 1567 $ 1,253.60
<br />
<br />25 2557.602 Salvage & Reinstall Mailbox 2 EACH $ 20.00 EACH I $ 40.00 21 $ 40.00
<br />26 2564.602 Salvage & Reinstall Sign 2 EACH $ 20.00 EACH $ 40.00 1 $ 20.00
<br />
<br />27 2571.504 Coniferous Shurb 18" 4 SHRB $ 150,00 SHRB I $ 600.00 4[ $ 600,00
<br />
<br />28 2573,603 SIIt Fence 15 LF $ 10.00 LF $ 150.00 0 $
<br />29 2575.505 Sodding 1320 SY $ 4.00 SY ;$ 5,280.00 1265.5 $ 5,062.00
<br />
<br />30 2575.609 Turf Establishment 0.5 LS $ 1,500.00 IACRE $ .750.00 0;$
<br />
<br />Total Bid Schedule "C" $ 92,267.00 $ 89,871.62
<br />
<br />shared docslmunlcipallaramsey14181RA418BP.xls --71--
<br />Sheel; PAY ESTIMATE 5 Page 3 of 5
<br />
<br />
<br />
|