|
PAY ESTIMATE NO. 5 ENGINEER
<br />Improvement Projects 99-66, 99-68 and 00-26
<br />
<br />Schedule "B" - Improvement Proiect gg-68, 1641h Lane NW
<br />
<br />Item Estimated
<br />No. Spec. Ref. D..es~;..ription Quantity Unit Price Extension Used to Date Extension
<br />1 2101.502 Clearing 3 TREE $ 300.00 TREE $ 900,0..0. 1 $ 300.00
<br />2 2101.507 Grubbing 3 TREE $ 300.00 TREE $ 900,00 1 $ ,, 300.00
<br />
<br /> 3 2104.505 Remove Bituminous Pavement 210 SY $ 2.00 SY $ 420.00 196.8i $ 393.60
<br />
<br /> 4 2104.513 Sawing Bituminous Pavemer~t.(.Full Depth) 323 LF $ ,,. 3.00 LF $ 969.00 286.8 $ 860.40
<br />
<br />5 2104.602 Relocate Tree 5 EACH _$ .... 300.00 EACH $ 1,5.00.00 4 $ 1,200,00
<br />6 2105.521 Granular Borrow, LV 50 CY .$,. 10.00 CY $ 500.00 0 $ -
<br />7 2105.525 TopsoiiBorfow., LV . , 100 CY $ 10.00 CY $ 1,000.00 80 $ 800.00
<br />8 2105.609 Geotextile FabdcType IV 15 SY $ 5.00 SY $ 75.00 20 $ 100.00
<br />9 2211.501 Aggregate Base Class 5 104 TON $ 8,00 TQN $ 832,00 21.3 $ 170.40
<br />10 2340.508 Type 41..Wearing Course Mixture 35 TON $ 34,00 TON $ 1,190,00 35.7 $ 1.213.,80,
<br /> 5 EACH :$ 150,00 EACH $ 750.00 5 $ 750.00
<br />11 2501.515 18" CM Pipe A, pron , ,
<br />12 2501.567 ,1,8" Metal Safety End 1 EACH .$.. 200,00 EACH $ 200,00 1 $ 200.00
<br />13 2503.51I 18" Corrugated PE Pipe (CPP) 736 LF $ 25,00 LF $ 18,400.00 1070 $ 26,750.00
<br />14 2506.501 Constru~!..Dr.ainage Structure Design48-4020 15.87 LF $ 170.00 LF $ 2,697,90 19,54 $ 3,321.80
<br /> 1 EACH $ 250.00 EACH $ 250.00 4 $ 1,000,00
<br />15 2506.602 Casting Assemblies Type,1 ........
<br />16 2506.602 Casting Assemblies Type 3 ,., 2EACH $ 280.00 EACH $ 560.00 2 $ 560.00
<br />17 2511.501 Random Riprap Class II 4 CY $ 40.00 CY $ 160.00 6 $ 240,00
<br />18 2557.602 Salvage & Reinstall Mailbox 10 ,E~._.C.H , $ 20.00 EACH $ 200.00 6 $ 120.00
<br />19 2564.602 Salvage & Reinstall Sign 1 EACH $ 20.00 EACH $ 20.00 0 $
<br />20 2573.501 Bale Check 33 EACH $ 10.00 EACH $ 330.00 0 $
<br />21 2573.603 Silt Fence 15 LF $ 10,00 LF $ 150.00 15 $ 150.00
<br />22 2575.505 Sodding 2247 SY $ 4.00 SY $ 8,9,88.00 1937.7 $ 7,750.80.,,
<br />23 2575.609 Turf Establishment 0.24 ACRE $ 1.500.00 ACRE $ 360.00 0,10 $ 150.00
<br />
<br />Total Bid Schedule "B" $ 41,351,90 $ 46,330.80.
<br />
<br />7
<br />- ~$~ared doc.~m u nicip at/aramsey/418IRA418R P,XlS
<br /> Sheet: PAY ESTIMATE 5
<br />
<br />Page 2 of 5
<br />
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />
<br />
<br />
|