Laserfiche WebLink
Amcor Precast, Inc. <br />Page 2 of 4 <br />May 15, 2001 <br /> <br />Setbaclcs: The proposed manufacturing and office building exceeds the minimum 40-foot front yard, <br />35-foot rear yard and 20-~bot side yard setbacks established in the BW District. <br /> <br />Architectural Standards: City Code restricts structure height to 35 feet; the manufacturing plant is <br />proposing to be 44' 10" in height. This is a deviation from City Code and will require a variance. The <br />Board of Adjustment met on May 1, 2001 and denied the request for a variancb to height restriction. The <br />-City has received a request for a variance appeal that will be heard by the City Council on May 22, 2001. <br /> <br />Cie./ Code requires exterior wail finishes to be brick, natural stone or pre-cast concrete, or fabricated <br />panels of these materials. The exterior building materials for the addition is proposed to consist of pre- <br />cast concrete panels, a pre-finished metal cap~ and pre-finished metal wall panels above the concrete <br />panel portion of the building extending to the pitch of the roof which meets City Code requirements. <br /> <br />A color rendering of the office and manufacturing plant is required at the time of the City Council <br />meeting. <br /> <br />Screening: The site plan is proposing a berm that is approximately 3-feet in height along i43rd Avenue, <br />this does not meet City standards. The berm should be a minimum of six feet in height and the site plan <br />should be revised to include the proposed ground covering and how the berm will be irrigated. The berm <br />along 143rd is proposing plantings that do not correspond with the "List of Recommended Trees and <br />Shrubs in the City of Ramsey (attached for your review)." The site plan should be revised to include <br />only trees and shrubs that are recommend for the City of Ramsey. <br /> <br />The site plan is also proposing a berm along Ebony Street that is approximately 2' 6" in height; this does <br />not meet City standards. The berm should be a minimum of eight feet in height with a maximum <br />average slope of 6 to 1 on the east face. The berm should also include grass or other ground cover and <br />various tree and shrub plantings as approved by the City. The site plan should be revised to include <br />plantings that are approved species in the City of.Ramsey and provide an irrigation plan for the berm. <br />Deciduous trees should be planted at a minimum of 35 feet intervals parallel with Ebony Street and <br />should consist of at least two varieties. Coniferous trees should be placed below the crest of the berm in <br />groups of 3 to 5 between the deciduous trees spaced in boulevard fashion. Staff is recommending that <br />the conifers consist of white and Norway pine. <br /> <br />All individual plants and trees must be sited in a degradable mulch if that portion of the berm Mil not be <br />irrigated. Each tree must be adequately benched into the berm to provide for appropriate water retention. <br /> <br />Waste Storage: The site plan should be revised to indicate where the waste storage facility is proposed <br />to be located and the construction materials. <br /> <br />Off-Street Parking - Design: City Code requires all driveways, off-street parking areas, and <br />maneuvering areas and display areas to be paved with concrete or bituminous pavement and finished <br />with B-6/12 concrete curbing. The site plan indicates that curbing will not be provided around the entire <br />bituminous area. It should be noted that deviations from the required concrete curbing will require City <br /> <br />-154- <br /> <br />i <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> I <br /> <br />I <br />I <br />I <br />I <br />! <br /> <br /> <br />