My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/22/2001
Ramsey
>
Public
>
Agendas
>
Council
>
2001
>
Agenda - Council - 05/22/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:22:24 PM
Creation date
9/4/2003 12:19:22 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/22/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Ramsey City Hall <br />Addition and Remodeling <br /> <br />BKV Group would work closely with the City Staff, City Council, and Construction Manager <br />on the following activities. <br /> <br />PHASE I: PRE-DESIGN & CONCEPT ALTERNATIVES · Background Review <br /> · Existing Building Audit <br /> · Needs Assessment Confirmation <br /> · Site and Building Concept Alternatives <br /> <br />pHASE I1: PROJECT IMPLEMENTATION - Schematic Design Phase <br /> · Design Development Phase <br /> - Construction Documents Phase <br /> · Bidding/Ne§otiation Phase <br /> · Construction Phase <br /> <br />The architect's fee for basic service for Phase I Pre-Design and Concept Alternatives and <br />Phase II Project Implementation will be based on 8,5% of the cost of construction. The <br />workscope includes services for architectural, structural, mechanical and electrical engineer- <br />lng, interior design, civil engineering and landscape design. For the purposes of this propos- <br />al, the cost of construction is assumed to be approximately $5,000,000. <br /> <br />Furniture and Equipment <br />The design fee for furnishing, equipment and signage from schematics through installation <br />would be based on 8,5% of the FF&E cost. <br /> <br />Reimbursable Expenses <br />Expenses of printing Bid documents, CADD files, mylars, reproductions, postage and travel <br />should be billed at a cost to the client. <br /> <br />BKV <br />G R O.U P <br /> <br /> · -277- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.