My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/10/2001
Ramsey
>
Public
>
Agendas
>
Council
>
2001
>
Agenda - Council - 07/10/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:24:33 PM
Creation date
9/4/2003 1:48:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/10/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br />I <br /> <br />23. <br /> <br />24. <br /> <br />25. <br /> <br />2{5. <br /> <br />27. <br /> <br />28. <br /> <br />29. <br /> <br />30. <br /> <br />31. <br /> <br />.32. <br /> <br />Water Quality. Surface and ground waters originating outside and passing through or <br />adjacent to the Site and runoff water discharged from the Site shalI, at its point of departure <br />from the Site, meet all applicable federal and state water quality standards as they ex/st from <br />rime to time during the period of this CUP: The operator shall perform any water treatment <br />necessary to comply with applicable state and federal water quality standards as they exist <br />from rime to time during the period of this CUP. Grading and drainage plans shall be <br />submitted to and approved by the City Engineer. Berming shall be installed as necessary to <br />control run-off. <br /> <br />Screening, The Permit Holder agrees to screen the aluminum processing facility from <br />any public street. Such screening shall be achieved using grading, landscape elements, <br />and/or plant materials which will achieve up to 90% opacity. Supplemental screening of <br />the Site may be ordered by the City to comply with the then current screening requirements <br />for outside storage on industrial property. <br /> <br />Off-Street Parking. Off-street parking shall be provided such that there is at least one <br />parking space for each employee on the maximum working shift plus three spaces for <br />visitor parking. <br /> <br />Surfacing of Work Areas. Ail storage areas, parking areas and driveway areas Shall <br />be surfaced with bituminous or concrete. <br /> <br />Building Permits. No construction or remodeling of any structures shall commence <br />prior to .the issuance of a building permit by the City Building Official and site plan <br />approval by the City Council. <br /> <br />Electrical. The building's electrical system must be inspected and brought up to code <br />within 30 days of this CUP. An affidavit of compliance shall be filed with the City within <br />five working days after final inspection. <br /> <br />Sanitary Se,ver. The Permit Holder shall petition for City sewer and water within 30 <br />days of the date of action on this CUP. In the event that the petition fa/is, the Permit <br />Holder shall install an on-site system or submit an alternative sewage handling treatment <br />plan for Council approval. <br /> <br />Scope and Conduct of.Operations. The operations permitted by this CUP may be <br />performed on the Subject Property in conformance with existing statutory and regulatory <br />authority and requirements of the City, Anoka County, Minnesota ("County"), and the <br />Minnesota Pollution Control Agency ("MPCA"). <br /> <br />Furnaces. This permit shail be issued allowing for the use of two melt furnaces as <br />described by the applicant in the CUP application support information. An increase in <br />furnace capacity or a third melt furnace shall not be added to the operation without <br />application and approval of a new CUP. <br /> <br />Closure Due to CUP Revocation, Other Cir'kumstanees. In the event this CUP <br />is revoked or the Permit Holder closes operation of the aluminum processing operation for <br />any reason, including but without limitation, order of the court or other agency of <br />competent jurisdiction, bankruptcy, insolvency, or abandonment, the Permit Holder shall <br />immediately proceed to remove all feedstock and other material from the site. In the event <br />the Permit Holder fails to comply with the terms of this CUP, the City may, upon 30 days' <br />written notice to the Permit Holder enter into the property and pe~orrn all such obligations, <br />the costs of which shall be borne by the Permit Holder or, in default thereof, by its surety. <br /> <br />-131- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.