Laserfiche WebLink
I <br />I <br /> <br />MISCELLANEOUS STRUCTURE <br />CONTRACTUAL CONDITIONS <br /> <br />Sections M, N, and O of these General Contractual conditions, as <br />modified by the proposal, are applicable only to the structures or work <br />described in those sections respectively. <br /> <br />Section M - ELEVATED TANKS <br /> <br />Mt The structure shall consist of a steel tank supported on a steel <br />tower as shown in the plan accompanying the proposal. <br /> <br />I <br /> M2 On single pedestal elevated tanks, a subsurface investigation is <br />I required to ensure structural stability. A subsurface investigation of the <br /> site including a report by a soils engineer familiar with settlement <br /> limitations and loads imposed by the structure shall be made by <br /> Purchaser or upon mutual agreement by Contractor on behalf of <br /> Purchaser wi~bout cost to Contractor. The subsurface investigation <br />I shaft include recommendations for type of foundation, <br /> report <br /> construction procedures and allowable soil beadng pressure which will <br /> keep settlement within structural tolerances. Upon request of <br /> Purchaser, Contractor shaft furnish for the guidance of the soils <br />I engineer the structural tolerances for settlement and a suggested <br /> subsurface investigation for the proposed elevated tank. The <br /> subsurface investigation shall include a minimum of three soil bodngs at <br /> each Structure site spaced 120 degrees apart at a radius slightly <br />Igreater than the outside radius of the foundation base slab. The <br />subsurface investigation report and, if requested, soil samples shall be <br />supplied to Contractor. If the proposed is made pdor to receipt by <br />Contractor of the subsurface investigation report an assumed value for <br />I the bearing pressure will be used (4000 pounds per squ'Jre foot net at <br /> five feet depth or frost depth whichever is greater unless otherwise <br /> specified in the proposal} and designs and prices quoted w~l be subject <br /> to change upon receipt and analysis of the subsurface investigation <br /> <br />ireporL <br /> <br /> M3 If cathodic protection apparatus is included in the proposal, <br /> Purchaser shall provide the power outlet, together with a fused <br /> weatherproof switchbox, within twenty feet of the tower column on <br />Iwhich the conduit is to be located. <br /> <br /> Section N - FLAT l~O'l-l'OM STORAGE TANKS <br /> <br />N1 The bottom plates shall be laid directly on the grade or foundation <br />and welded together thereon. Lap joints shall be used with continuous <br />welding on the upper side only. <br /> <br />N2 When a steel roof of fixed type is furnished, it shall be welded on <br />the upper side only with lap joints. <br /> <br />N3 If a stairway or a fixed ladder is provided, it shall be designed to <br />support safely a load of one thousand (1000) pounds at any one point. <br />An inside ladder will not be provided unless so stated in the proposal. <br /> <br />N4 If a grade is provided by Purchaser under the tank, it shall be <br />furnished and maintained level by Purchaser. If a concrete foundation <br />is provided by Purchaser under the tank, it shall be level within plus or <br />minus one-eighth inch within any thirty feet of arc length, and no two <br />points on the periphery shall differ in elevation by more than one-half <br />inch. <br /> <br />N5 Unless otherwise stated in the Proposal, Purchaser shall assume <br />full responsibility for the design and adequacy of any dikes and <br />containment systems which may be required in connection with the <br />tanks. <br /> <br /> Section O - REPAIR WORK AND NEW WORK IN AN EXTRA <br /> HAZARDOUS AREA <br />IOt This section covers all work (whether new, alterations, repairs or <br />otherwise) performed in an extra hazardous area, ail §eld repairs, <br />alterations or extensions of existing structures and all work by <br />i Contractor upon structures not originally furnished by Contractor. <br /> Pdnted ia USA <br /> <br />02 Structures that have been used in certain types of storage and <br />processing service present unusual safety hazards to pemonnel in the <br />work area. Purchaser shall physically disconnect all such structures <br />from existing piping before Contractor undertakes any work. Unless <br />cleaning is specifically stated to be part of the work covered by the <br />proposal, Purchaser shal[ dean the structure and fre~ it from any toxic <br />or hazardous substances, including but not limited to asbestos, shall <br />maintain the work area entirely free of explosives, combustible, toxic, <br />asphyxiant and hazardous substances at no cost to Contractor and <br />shall sign a safe work order on usual form provided by Contractor for <br />that purpose before any work is commenced by Contractor. <br /> <br />03 Before work is commenced on an existing structure Purchaser <br />shall furnish to Contractor a complete set of 'as built' drawings of the <br />structure, and also a statement of the age of the structure, the service <br />in which it has been used, the nature and extent of repairs, <br />modifications and extensions contemplated, the test, if any, to be <br />performed upon completion of work, and the proposed service of the <br />structure after completion of w~rk. <br /> <br />04 Unless so stated in the proposal, testing is not included in the work <br />to be done by Contractor. If the proposal includes testing, then Section <br />G of these General Contractual Conditions shall apply. <br /> <br />05 Section K does not apply to work covered by this Section O. <br />Purchaser must take fully responsibility for the conditions of the <br />structure pdor to the commencement of work, the nature and extent of <br />the work, the removal and making safe to Contractor's satisfaction of <br />any toxic or hazardous substances or materials, including but not <br />limited to asbestos, which may be discovered during performance of the <br />work or which may adversely affect the safe performance of the work, <br />the adequacy of the structure to meet Purchaser's needs upon <br />completion of work and for the type and severity of any test to be <br />imposed upon the structure upon completion of work. This <br />re~."~ponsibiiity of Purchaser shall also include the effects of prior us <br />(such as distortion, corrosion, and abrasion) upon structural adequacy, <br />and the effects af any proposed changes in operating conditions (such <br />as pressure, temperature, chemical and electrolytic properties of the <br />product to be transported, stored, or processed) upon the suitabil~ of <br />the structure upon completion of work for the service intended. <br /> <br />06 Purchaser shall either buy builder's risk insurance or keep the <br />structures affected by the work being performed covered by all-r~sk <br />insurance, in either case with Contractor as a named insured on the <br />.polidy and which provides primary coverage of not less than the full air <br />'market value of the structures affected by the work performed, and <br />such coverage shall waive all rights of subrogation against Contractor. <br />Purchaser shall assume all deductible amounts and shall furnish <br />evidence of such coverage to Contractor. Purchaser assumes the dsk <br />and waives any right of recovery (including subrogation) against <br />Contractor for any loss of, damage to or loss of use of any Purchaser's <br />property. The foregoing waiver shall apply to the full extend pen'nitted <br />by law and regardless of fault on the part of Contractor. <br /> <br />07 Without limiting any of the liabilities of Purchaser hereunder, <br />Purchaser shall also keep in effect a Commercial General Liability <br />insurance policy with combined single limits not' less than $5,000,000 <br />per occurrence. Such policy shall name Contractor as an additional <br />insured and will provide primary insurance, non-contributing with any <br />othe~' valid insurance or self-insurance coverage to the Contractor. <br />Purchaser shall assume all deductibles under such insurance. <br /> <br />08 Section L does not apply to work covered by this Section O. With <br />respect to any work covered by this Section O, CONTRACTOR MAKES <br />NO WARRANTY OF MERCHANTABILITY OR OF FITNESS FOR A <br />PARTICULAR PURPOSE OR ANY OTHER WARRANTY OF ANY <br />KIND, EXPRESS OR IMPLIED. Contractor shall not be liable for loss <br />of use of Purchaser's property, loss of profits or revenues or any <br />special, indirect, incidental or consequential loss or damage <br />whatsoever. The foregoing limitation of liability shall apply to the full <br />extent permitted by law and regardless of fault on the part of Contractor. <br /> <br />NAC 115 (Page 4 of 4) Rev ~ <br /> <br /> <br />