My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/28/2001
Ramsey
>
Public
>
Agendas
>
Council
>
2001
>
Agenda - Council - 08/28/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:26:55 PM
Creation date
9/4/2003 2:30:20 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/28/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-438- <br /> <br />A~'¢_.. ENG[ N E;~"R|NG <br /> <br />400 1st Avenue North <br />Suite 400 <br />Minneapolis, Minnesota 55401 <br />Phone: (612) 332-8g05 <br />Fax: (612) 334-3101 <br /> <br />ENGINEERS <br />INSPECTORS <br /> <br />April 30, 2001 <br /> <br />Mr. Sleeve Jankowski <br />City Engineer <br />City 'of Ramsey <br />15153 Nowthen Blvd. <br />Ramsey, MN 55303' <br /> <br />By US Mail & Fax <br /> <br />(7'63) 427-5543 <br /> <br />Subject: <br /> <br />Location: <br />AEC Proposal #: <br /> <br />Proposal to provide Project Management and Construction Inspection for <br />the Installation of a Mezzanine in the New 1,500,000 Gallon Water Tower <br />Ramsey, MN <br />01MN2-060 <br /> <br />Dear Mr. Jankowski: <br /> <br />AEC Engineering is pleased to submit this propo.cal to provide project management and <br />construction inspection for the installation of a mezzanine in the new water tower. <br /> <br />In order to meet your project requirements, we can begin work shortly after receipt of your <br />authorization to proceed. At this time, we do not know the time required to build the <br />mezzanine. This will be determined after further discussions with Chicago Bridge & Iron (CBI). <br /> <br />scgpe of Work <br /> <br />The Scope of Work includes the following items: <br /> <br />AEC will coordinate the design of the mezzzanine with CBI, specifying the floor loading and <br />ciearance requirements. We will obtain an estimated construction cost as soon as possible. <br /> <br />AEC will review CBI'S drawings and calculations. <br /> <br />AEC will provide field inspection during the construction and coating of the mezzanine. <br /> <br />Customer Responsibilities <br /> <br />Prior to starting work, we will need the following information: <br /> <br />Resolution regarding ~he number and placement of generators in the tank so ~hat ventilation <br />access can be provided. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />! <br />I' <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.