My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/11/2001
Ramsey
>
Public
>
Agendas
>
Council
>
2001
>
Agenda - Council - 09/11/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:27:15 PM
Creation date
9/4/2003 2:47:05 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/11/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> <br />I <br />! <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Preliminary Plat Review: Centex Addition <br />July 5, 2001 <br />Page 4 of 5 <br /> <br />12. <br /> <br />Park Dedication: The sketch plan was reviewed by the Park Commissfon on May 10, 200I. <br />The Commission has recommended some land dedication to expand Bear and Woodland <br />Green parks and provide trail connections; any remaining park dedication due will be <br />satisfied with a cash payment. During the sketch plan review, the consensus of the Park <br />Commission was that improvements to Woodland Green and Bear Parks should also be <br />considered for construction as part of the plat Stage I improvements. The costs would also <br />be credited against any cash due for park dedication. These improvements have been <br />identified as play equipment for Woodland Green, park/ng and irrigation for Woodland <br />Green and possibly Bear Park too. The Commission is expecting to review the preliminary <br />plat on July I2. <br /> <br />13. <br /> <br />Trail Development: There is a trail development fee of $50,375.00 (155 units x $325/unit) <br />due on the plat prior to recording the f'mal plat. There is an 8 foot wide bituminous trail <br />connection proposed within a 35 foot wide corridor from the easterly terminus of 155th Lane <br />N.W., through the expanded Bear Park and terminating at Roanoke Street. There is another 8 <br />tbot wide bituminous trail within a 35 foot wide corridor proposed to link up with the <br />unnamed park lot to the north. The land dedication for these trail links is eligible for credit <br />against the park dedication due on the plat; the construction costs for these two trail <br />connections are eligible ~'or credit against the trail development fees due on the plat. <br /> <br />The Parks and Trails Plan also calls for a bituminous trail along the north side of Alpine <br />Drive (153rd Avenue N.W.). The Park Commission has requested that the entire segment of <br />trail along Alpine Drive from Hwy. ~47 to Roanoke Street be constructed as part of the Stage <br />I improvements in this plat. The land ded.ication within the boundaries of the plat is not <br />eligible for credit against the park dedication due on the plat Construction costs to install the <br />trail from the east boundary of the plat to Roanoke Street and the west boundary of the plat to <br />Hwy. #47 are eligible for credit against the trail development fees due. <br /> <br />14. <br /> <br />Trunk Sewer and Water Fees: A trunk usage charge is required for usage of the trunk sewer <br />and water system. The current rate is $1773.00 per residential unit created. A payment of <br />$274,815.00 (155 units x $1773/unit) is due a{'the City prior to releasing the plat for <br />recording. <br /> <br />-119- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.