My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/18/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 01/18/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 9:59:41 AM
Creation date
1/13/2011 4:39:42 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/18/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minnesota Department of Health - April 2010 <br />Work Item (describe the work that will be performed). <br />Create newsletter articles about proper well management and include them in the Ramsey Resident, the City's <br />periodic newsletter, <br />Estimated cost of performing this work: $2,100 <br />'/2 page article twice annually @ $850/ '/2 page = $1,700 <br />4 hours of staff time a $100/ hr = $400 <br />Product(s) produced or anticipated outcomes of performing this work: <br />Increased public awareness of the proper well maintenance will increase protection of individual wells that might <br />pose an entry port for contaminants into the public water supply aquifer <br />Page number(s) in the source water protection plan that reference the source water protection measure(s) <br />that will be supported by this work item: Page 23 <br />Work Item (describe the work that will be performed). <br />Accurately locate individual wells appearing in MDH and County Well records using GIS <br />Estimated cost of performing this work: $2,000 <br />20 hours of staff time @ $100/ hr = $2,000 <br />Product(s) produced or anticipated outcomes of performing this work: <br />An accurate and up to data base of wells will provide an effective tool for directing related action items contained <br />within this plan, <br />Page number(s) in the source water protection plan that reference the source water protection measure(s) <br />that will be supported by this work item: Page 24 <br />Work Item (describe the work that will be performed). <br />Review and update the current IWMZ for each well <br />Estimated cost of performing this work: $800 <br />8 hours of staff time @ $100/ hr $800 <br />Product(s) produced or anticipated outcomes of performing this work: <br />Remain informed and' up to date on activities within the IWMZ, <br />Page number(s) in the source water protection plan that reference the source water protection measure(s) <br />that will be supported by this work item: Page 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.