My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/25/2011
Ramsey
>
Public
>
Agendas
>
Council
>
2011
>
Agenda - Council - 01/25/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 1:34:50 PM
Creation date
1/20/2011 6:14:25 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/25/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cost of the noise wall. The project federal fund percentage ( determined by dividing total cost of <br />federally eligible items by federal dollars available) will be applied to the cost of warranted noise walls. <br />BITUMINOUS TRAIL: <br />The parties agree that the construction of the bituminous trail along the north side of the roadway is <br />eligible for federal funds and that the City will contribute all matching funds. This trail location has been <br />agreed to by the City. If this location changes in the future, the additional costs associated with this <br />change will be the responsibility of the City. The parties understand that the cost for the trail includes: <br />bituminous surfacing, aggregate base, excavation (including muck excavation), borrow material <br />(granular and topsoil), and turf establishment. The parties agree that the County will pay for the design <br />of the trail, wetland mitigation required by impacts caused by the trail, the additional right of way and <br />easements required to construct the trail at the proper location, and any removal items, with the <br />exception of soils, required to construct the trail. The parties understand and agree that all future <br />maintenance of the trails, including snow plowing, shall be the sole responsibility of the City. <br />The trail along the north side of CSAH 116 is part of the County Regional Trail System and is eligible <br />for potential funding through the Metropolitan Council's Regional Parks Capital Improvement Program. <br />After the project has been constructed, and a request has been made by the City to the county, the Anoka <br />County Parks and Recreation Department will seek reimbursement for one-half of the City's share for <br />trail construction along CSAH 116. If funds are secured, the Anoka County Parks and Recreation <br />Department will reimburse the City with the additional funds received. <br />TRAFFIC CONTROL: <br />The parties understand and agree that CSAH 116 from Tungsten to Magnesium streets will be closed to <br />through traffic during construction for a period of time, but will always be open to residences located in <br />the closure who have no alternative route to their home. This closure will be minimized based on the <br />construction of this segment of CSAH 116 due to deep muck excavation and potential surcharge (to be <br />determined during the design process). The parties agree and understand the cost share for traffic <br />control, pending Federal funding shall be a prorated share based on the project cost divided by the total <br />project cost. It is understood that Anoka County will use best management practices to limit the amount <br />of time that this segment of roadway is closed. <br />DRIVEWAYS: <br />The parties agree that all driveways affected ( excluding those identified for removal) by the Project will <br />be reconstructed in kind with the cost of any upgrades requested by the City, including concrete aprons, <br />to be the responsibility of the City. <br />LAND S CAPING/STREETS CAPING: <br />The parties agree that if the City wishes to include landscaping or streetscape features in the project, <br />they shall be designed in accordance with Anoka County Highway Department Landscape/Streetscape <br />Guidelines. The City's design of the landscaping/streetscape is to include the signed plan sheets, <br />specifications, estimated quantities and costs. The total cost of the design as well as the construction cost <br />above standard median cost will be at the expense of the City. All construction documents must be <br />submitted to the County by October 31, 2010. <br />
The URL can be used to link to this page
Your browser does not support the video tag.