Laserfiche WebLink
UTILITIES: <br />The parties agree that the Exhibit "A" Layout does not include specific proposed utility locations. The <br />City will be responsible for the design of any sanitary sewer and water main improvements, which will <br />be incorporated into the project bid documents. The cost of the design and construction of these features <br />will be the responsibility of the City. The City's design of the sanitary sewer and water main utilities are <br />to include the signed plan sheets, specifications, estimated quantities and costs. All construction <br />documents must be submitted to the County by October 31, 2010. <br />If allowed by MnDOT and FHWA the City may choose to improve a small segment of Magnesium <br />Street north of the proposed construction limits for this project. The City will be responsible for the <br />design of this improvement, which will be incorporated into the project bid documents. The cost of the <br />design and construction of this improvement will be the responsibility of the City. The City's design for <br />this work will include the signed plan sheets, specifications, estimated quantities, and costs. All <br />construction documents must be submitted to the County by October 31, 2010. <br />Any additional drainage contributions that arise due to this city requested extension shall be computed <br />into the drainage percentage that the city is responsible for. No federal dollars will be utilized for the <br />additional drainage contribution (if any) or roadway construction. <br />PERMITS: <br />The parties agree that the County will secure all necessary permits for this Project. The City agrees to <br />coordinate with the County in securing the permits required by the Lower Rum River Watershed <br />District. <br />II. METHOD: <br />The County shall provide all engineering services and shall cause the construction of the Project in conformance <br />with said plans and specifications. The County shall do the calling for all bids and the acceptance of all bid <br />proposals. <br />III. COSTS: <br />A. The contract costs of the work, or if the work is not contracted, the cost of all labor, <br />materials, normal engineering costs and equipment rental required to complete the work, shall constitute <br />the actual "construction costs" and shall be so referred to herein. "Estimated costs" are good faith <br />projections of the costs, which will be incurred for this project. Actual costs may vary and those will be <br />the costs for which the relevant parties will be responsible. <br />