My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/25/2011
Ramsey
>
Public
>
Agendas
>
Council
>
2011
>
Agenda - Council - 01/25/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 1:34:50 PM
Creation date
1/20/2011 6:14:25 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/25/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. The estimated construction cost of the project (including County furnished materials) is <br />$6,027,162. Federal funds available for the Project are capped at $3,680,800.00 The federal funds shall <br />be split based on the ratio of eligible cost incurred by each party to the total eligible project cost. <br />Eligible costs are the costs of items that can participate in federal funding as shown on Exhibit A. <br />Participation in the construction cost is as follows: <br />A lump sum amount of $450,000 will be paid by the City of Ramsey to Anoka County for the <br />improvements on CSAH 57 (Sunfish Lake Blvd.), which includes engineering and design but does not <br />not include noise walls, or the needed right of way to construct said walls.. This amount is per the <br />Ramsey Town Center Agreement. The remaining work on CSAH 116 will be split per the County <br />standard cost share policy. The amounts below are for CSAH 116 and are based on the standard Anoka <br />County cost share. <br />1. The City shall pay their share of mobilization and equipment field office as determined using the <br />Engineer's Estimate. The estimated City cost of these items is $19,580 <br />2. The City shall pay their share of the Trail installation. The estimated cost of this item to the city <br />is $39,600 <br />3. The City shall pay their share of the drainage costs. The estimated City cost of this item is <br />$64,314. (66% of the city's share of 26.5%, assumption is that 1/3 of city drainage cost is on <br />CSAH 57 and covered by lump sum stated above). Final percentage is based on State Aid <br />drainage letter. <br />4. The City shall pay their share of the cost of concrete curb, medians and sidewalks installed on the <br />project. The estimated cost to the City is $36,531. <br />5. The City shall pay its share of the cost of signals (cost covered in lump sum stated above). <br />6. The City shall pay its share of the cost of noise walls. The estimated cost is $245,007. This cost is <br />before federal funds are applied. <br />The total estimated cost to the City for the project is summarized below: <br />1 Mobilization, Field Office $19,580 <br />2 Bituminous removal and muck excavation $0 <br />3 Drainage $64,314 <br />4 Concrete curb, medians, and sidewalks $36,531 <br />5 Signals $ 0 covered <br />in lump sum <br />6 Noise walls $245,007 <br />Lump sum as stated above for CSAH 57 work $450,000 <br />Total Estimated Share of Construction Cost To The City $815,432 <br />Estimated Federal Funds available to the City $223,169 <br />61.07% estimated Federal participation * $365,432 <br />( $815,432 - $450,00 lump sum) <br />Total Cost less Federal Funds $592,263 <br />
The URL can be used to link to this page
Your browser does not support the video tag.