Laserfiche WebLink
(6) LIST THE REQUIRED MATERIALS ONLY AND THE ESTIMATED MATERIAL COSTS <br /> FOR THE PROJECT (soil amendments,, herbicide, plant materials, seed, sod? construction materi- <br /> als, weed fabric, mulch, rodent protection, etc.) DO NOT INCLUDE LABOR OR EQUIPMENT. <br /> PROJECZ MATE;RI,aLS QUANTITY ESTIMATED COST <br /> (on state right of way only) <br /> <br />TOTAL MATERIAL coST <br />(Include'Sales Tax and Shipping) <br /> <br />(7) SHOW THE DESIRED TIMY_,TABLE FOR COMPLETION OF EACH MAJOR COMPO- <br /> NENT OF THE PROPOSED PROJECT FROM PREPARATION OF PLANTING AREAS <br /> THROUGH COMPLETION OF INSTALLATION. <br /> <br /> TIMETABLE BEGINNING DATE: ENDING DATE: <br />COMPONENT YEAR J F M A M J J A 5; O N D <br />Pretimina,D' layout and staking <br />Spray or remove existing weeds & grasse~ <br />Cultivate planting and seed/ng areas <br />(soil amendments, rototilling) <br />Stake individual plant locations - <br />"install plants .. -- <br />Install turf <br />Install mulch &' pla'nt protection'" <br /> <br /> <br />