Laserfiche WebLink
-180- <br /> <br />Shared Cost with C.O.R. Proi~ct 02-21 <br /> <br />To achieve the water quality goals for the contributing area, the storm water from <br />the properties fronting about 900 feet of Helium Street will be routed to a <br />proposed detention basin to be located on the rear of one lot south of 152nd Ave. <br />being built in the C.O.R. Project No. 02-21. The area of runoff from this project <br />area was approximately 50% of the total area of runoff draining to the detention <br />basin in Project 02-21. The storm drain culverts and detention basin volume were <br />increased in size to handle this additional runoff. Therefore, it is proposed that <br />50% of the cost of the storm drains between that detention basin and the Helium <br />St. project be allocated to be used as an in-kind value provided by the City in <br />negotiating for the road right-of-way. <br /> <br />Shared Cost with C.O.R. Project 02-22 <br /> <br />To achieve the water quality goals for the contributing area, the storm water from <br />the properties fronting about 200 feet of Helium Street will be routed to a <br />proposed relocated detention basin to be located on the rear of two lots west of <br />existing Helium St. in Pondvale Estates, C.O.R. Project No. 02~22. The storm <br />drain culverts and detention basin volume were increased in size to handle this <br />ad(~itional runoff. Therefore, it is proposed that 25% of the cost of the storm <br />drains between that detention basin and the Helium St. project be allocated to be <br />used as an in-kind value provided by the City in negotiating for the road right-of- <br />way. <br /> <br />See "EXHIBIT A" for detailed description of the proposed street and storm <br />drainage improvements. <br /> <br />B. Water System <br /> <br />The proposed water system improvements will provide a minimum 8" water main <br />to allow the inter-connection to the water system provided in the other two project <br />areas discussed earlier. All mains will be DIP. Fire hydrant spacing will be <br />approximately 300 to 400 feet. Where the adjoining property is undeveloped, <br />one-inch services will be provided at 85-foot intervals. <br /> <br />See "EXHIBIT B" for detailed description of the proposed water system <br />improvements. <br /> <br />C. Sanitary sewer System <br /> <br />All proposed sanitary sewer lines will be 8" PVC pipe with manhole spacing at <br />400-feet maximum. The depth of the sanitary sewers will be between 10 to 18 <br />feet. <br /> <br />Page 4 <br />G;\MunicipaI~ARAMSEY,3168\RA3168FSR 1 .doc <br /> <br /> I <br />I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br />I <br />I' <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />