Laserfiche WebLink
TABLE 1 <br />OPTIOCq 1, PAVED STREET <br /> <br />SUMMARY OF ESTIMATED TOTAL PROJECT COST <br /> <br />Street Construction Cost <br />Storm Drainage Construction Cost <br />Water Construction Cost <br />Sanitary Sewer Construction Cost <br />Total Construction Cost <br /> <br /> Construction Overhead Cost (33%) <br /> Estimated Construction Cost <br /> ROW & Easement Cost <br />-(.95 Acres@ $ 40,000/Acre) <br /> <br />$181,245 <br />$ 94,155 <br />$ 83,299 <br />$ 75,675 <br /> <br />$434,374 <br /> <br />$ 143,343 <br /> <br />$ 577,717 <br /> $ 38,000 <br /> <br />Total Project Cost $615,717 <br /> <br />In projecting the estimated costs of construction, data from projects constructed <br />in the metropolitan area over the last several years and a working knowledge of <br />the construction activity in the area were used. These costs are expressed in <br />current dollars. <br /> TABLE 1 <br /> OPTION 2, GRAVEL STREET <br /> <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SUMMARY OF ESTIMATED TOTAL PROJECT COST <br /> <br />Street Construction Cost <br />Storm Drainage Construction Cost <br />Water Construction Cost <br />Sanitary Sewer Construction Cost <br />Total Construction Cost <br /> <br />$101,878 <br /> $141,385 <br /> $ 83,299 <br /> $ 75,675 <br /> <br />$402,237 <br /> <br />I <br />I <br />I <br /> <br />6.0 <br /> <br />· Construction Overhead Cost (33%) <br /> Estimated Construction Cost <br />· ROW& Easement Cost <br /> (.95 Acres@ $ 40,000/Acre) <br /> <br />$ 132,738 <br /> <br />$ 534,975 <br /> $ 38,OOO <br /> <br />Total Project Cost $572,975 <br /> <br />METHOD O.F PAYMENT <br /> <br />The preferred method for financing the proposed improvements is to assess the <br />benefited properties on a front footage basis or on another equitable measurable <br />basis for the immediate area in accordance with Minnesota Statutes 429. Due to <br />comments received at the informational meeting regarding the large difference in <br />lot sizes, the staff is recommending the front foot method of financing for this <br /> <br />I <br />I <br />i <br />I <br />I <br /> <br /> Page 7 <br />-208- G:\MunicipalLARAMS EY\633\RA633FSR2.doc <br /> <br /> <br />