Laserfiche WebLink
I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />'1 <br /> I <br /> <br />8.0 <br /> <br />Water and Sanitary Sewer <br /> <br /> be <br />Water and sanitary sewer w~ill paid for by hookup fees as discussed in the <br />introduction of this Feasibility' Study. The current rate allocated to the laterals is <br />$10,322 per residence ($7,122 for water and $3,200 for sanitary sewer). Based <br />on a total number of twenty one (21) benefited property owners, who do not <br />already have water and sewer hookups, the hookups will generate $216,762. It <br />is anticipated that several lots will be subdivided, thereby increasing the <br />revenues to more than pay for the cost of the project. <br /> <br />Construction Cost of Water I $' 83,299 <br />Plus 33% Overhead $ 27,489 <br />Total Water Project Cost $ 110,788 <br />Construction Cost of Sanitary Sewer $ 75,675 <br />Plus 33% Overhead $ 24,973 <br />Total Sanitary Sewer Project Cost $. 100,648 <br />Total Cost of Water and Sewer Improvements $ 211,436 <br />Total water & Sewer ha0kup Charges per City Schedule $ 216,762 <br />21@ $10,322 Each = <br /> <br />PROJECTED PROJECT SCHEDULE <br /> <br />If the City should elect to proceed with the improvements, the following.schedule <br />could be anticipated: <br /> <br />1) Present feasibility study and set date of public <br /> hearing '- <br /> <br />2) Hold public hearing <br />3) Order plans and specifications (Following 60 day <br /> waiting period) <br />4) Begin Easement Negotiations <br />5) Pass Condemnation Resolution (if required) <br />6) Approve plans and specifications, authorize bids <br />7) Receive bids and award project <br />8) Finalize land acquisition (Based on negotiation) <br />9) Initiate construction <br />10) Complete construction <br />11) Hold Assessment Hearing <br /> <br />June 10,2003 <br /> <br />August12,2003 <br /> <br />October14,2003 <br /> <br />October 14, 2003 <br />December 9, 2003 <br />January 13, 2004 <br />February 24, 2004 <br />February 24, 2004 <br />April 1,2004 <br /> <br />June 30, 2004 <br />August 23~ 2004 · <br /> <br />The above schedule is based on utilizing the Assessment For Improvement <br />Procedures per Minnesota Statute 429. Should the City decide to fund the <br />project using alternate methods of financing, the schedule may need to be <br />modified. <br /> <br />Page 16 <br />G:\MunicipaI~ARAMSEY\633\RA633FSR2.doc -217- <br /> <br /> <br />