My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/12/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 08/12/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:52:30 PM
Creation date
9/5/2003 12:48:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/12/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Shared Construction Cost of, Storm Drainage $ 25,580 <br />Plus 33% Overhead <br /> <br />Total Cost of Shared Storm Drainage Construction <br /> <br />Plus Shared Easement Cost <br /> <br />8,441 <br />34,021 <br /> <br />$ 4,000 <br />$ 38,021 <br /> <br />Net Project Cost to be Shared <br />25% Share Allocated to Helium St. Proper[les for Right-of- $ 9,505 <br />Way Negotiations <br /> <br />Water and Sanitary Sewer <br /> <br />The current hookup fees for water and sanitary sewer are as stated in the City's <br />Schedule of rates and Charges. For water hookup, the lateral charge is $7,122 <br />and the trunk fee is $1,285. For sewer hookup, the lateral charge is $3200 the <br />trunk fee is $577. The total lateral charge for water and sewer is $10,322. The <br />current eight residences would generate $ 82,576. However, if each of the eight <br />groups of three lots would split into two lots, then the sixteen hookups would <br />generate $165,912. This would more than cover the expected cost shown <br />below. " <br /> <br />Construction Cost of Water $ 65,046 <br />Plus 33% Overhead $ 21,465 <br />Total Water Project Cost $ 86,511 <br /> <br />Construction Cost of Sanitary Sewer $ 48,653 <br />Plus 33% Overhead $ 16,055 <br />Total Sanitary Sewer Pi'oject Cost $ 64,708 <br /> <br />Total Cost of Water and Sewer $151,219 <br /> <br /> I <br /> I <br /> I <br /> i <br />I <br />I <br />! <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />-244- <br /> <br />8.0 <br /> <br />PROJECTED PROJECT SCHEDULE <br /> <br />If the City should elect to proceed with the improvements, the following schedule <br />could be anticipated: <br /> <br />1) Present feasibility study and set date of public June 10, 2003 <br /> hearing <br /> Hold public hearing <br /> Order plans and specifications (Following 60 day <br /> waiting period) <br /> Begin easement negotiations <br /> Pass condemnation resolution (if required) <br /> Approve plans and specifications and authorize <br /> bids <br /> <br />2) <br /> <br />3) <br /> <br />4) <br /> <br />5) <br /> <br />6) <br /> <br />August 12, 2003 <br /> <br />October 14, 2003 <br /> <br />October 14, 2003 <br /> <br />December 9, 2003 <br /> <br />January 13, 2004 <br /> <br />Page 7 <br />G:\MunicipaI~RAMSEY\832\RA632FSR1 .doc <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.