My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/12/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 08/12/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:52:30 PM
Creation date
9/5/2003 12:48:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/12/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />! <br /> <br />I <br />I <br />I <br />I <br />i <br />I <br />I <br /> <br />7.0 <br /> <br />required for public comment on this feasibility report will give t.he City Council an <br />opportunity to repeal this ordilnance. <br /> <br />The staff has proposed to the residents of the subdivision that the assessments <br />be made per the eight groups of two or three lots each owned by each resident. <br /> <br />COST ALLOCATION <br /> <br />streets <br /> <br />Since the project area had bituminous streets, the City Policy states that only one <br />half of the street construction costs are to be assessed to the benefited area. <br />The cost for concrete curb and gutter are included since the street has <br />bituminous curbs now. Following is a breakdown of the costs for the proposed <br />project: <br /> <br />Construction Cost of Streets I $ 83,881 <br />Plus 33% Overhead $ 27,681 <br />Total Cost of Street Construction $111,562 <br />Less City's 50% Share of Street Construction $ 55,781 <br />Net Project Cost to be Assessed $ 55,781 <br />Number of Properties Assessed 8 <br />Total Cost Per Property For Street $ 6,973 <br />Annual Assessment per Property For Street Construction $ 993 <br /> <br />The project cost allocations are based on the division of the cost equally betWeen <br />the eight property owner groups. The annual cost to each property owner is <br />based on amortizing over 10 years at 2.0 percent over the prime rate at the time <br />of the assessment hearing. A 7.0 percent interest rate is used in these <br />calculations. See Table 6 for a list of proposed assessments. <br /> <br />Storm Drainaqe <br /> <br />The City will pay for the storm drainage construction and easement cost from the <br />City's Storm Water Utility Fund. However, the City will use the 25% shared cost <br />allocated to the Helium Street properties north of Pondvale Estates in the <br />negotiation for right-of-way across those benefited properties. The 25% shared <br />cost was based on drainage areas. This shared cost is calculated below. <br /> <br />Page 6 <br />G:\MunicipaI~RAMSEY\632\RA632FSR1 .doc <br /> <br />-243- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.