Laserfiche WebLink
-242- <br /> <br />6.0 <br /> <br />The summary of estimated Oost of construction plus overhead and easements <br />are shown below in Tabte 1. <br /> <br />TABLE 1 <br /> <br />SUMIVlARY OF ESTIMATED TOTAL PROJECT COST <br /> <br />Street Construction Cost <br />Storm Drainage Construction Cost <br />Water Construction Cost <br />Sanitary Sewer Construction Cost <br />Total Estimated Construction Cost <br /> <br />Construction Overhead Cost (33%) <br /> Total Project Construction Cost <br /> <br />Easement Cost (0.1 Acres <br />$40,000/Acre) <br /> <br />Total Project Cost <br /> <br />$ 83,881 <br /> $ 39,42O <br /> $ 65,046 <br /> $ 48,653 <br /> <br />$237,000 <br /> <br />$78,210 <br />$315,210 <br /> <br />$ 4,000 <br />$319,210 <br /> <br />In projecting the estimated costs of construction, data from projects constructed <br />in the metropolitan area over the last several years and a working knowledge of <br />the construction activity in the area were used. These costs are expressed in <br />current dollars. <br /> <br />METHOD OF PAYMENT <br /> <br />The preferred method for financing the proposed improvements is to assess the <br />benefited properties on a front footage basis or on another equitable measurable <br />basis for the immediate area in accordance with Minnesota Statutes 429. Under <br />this method, the cost of the project would be assessed annually on the property <br />within the subdivision for a period of ten (10) years. Section 7.0 of this report <br />discusses the cost allocation. Only the street improvements , excluding the <br />storm drainage, will be paid for by assessments. <br /> <br />The storm drainage cost will be paid by the City's Storm Water Utility Fund. <br /> <br />The cost of the water and sanitary sewer will be paid with hookup fees at the time <br />of hookup per the City schedule of Rates and Charges. He time of hookup is <br />voluntary for lots that are already developed with a house upon. it with an <br />operational septic system. However, the City has an ordinance that requires <br />immediate hookup for newly created or subdivided lots. Upon sale of existing <br />lots with an existing residence, there is an additional ordinance that requires <br />connection to city services, if they are available. The sixty day waiting period <br /> <br />Page 5 <br />G:\M unicipalb~,RAMS E¥\632\RA632FSR 1 .doc <br /> <br /> I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I, <br /> I <br /> I <br /> I <br />I' <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />